International Shipping / Enquiries
Tell us what you need and our team will reply within 24 hours.
📐 Product Angles & Views
3D View / Front
Left Side
Right Side
Top Side
Product Video
VALVE CHEST - EXB
Part No: 40-205
Pack of 1
40-205: VALVE CHEST - EXB – The primary structural air valve housing chest that encloses internal spools, sleeves, and gaskets responsible for regulating the pump's pneumatic shifting cycle.
40-205: VALVE CHEST - EXB – The primary structural air valve housing chest that encloses internal spools, sleeves, and gaskets responsible for regulating the pump's pneumatic shifting cycle.
Key Features
- Robust structural manifold housing engineered to centralize and steer main pneumatic drive air loops.
- Heavy-walled cast block layout handles intense cyclic pressure strains and physical room knocks easily.
- Precision-machined internal chamber tracks ensure zero pressure bleed paths between shifting ports.
- Integrated heavy bolt flange plates secure a leak-free compression match against air motor blocks.
- Durable composition shields wetted directional air tracks from internal corrosion scaling traps.
Technical Specifications
| Manufacturer / Brand | Blagdon Pump |
| Component Classification | Main Air Distribution Valve Enclosure / Chest |
| Pump Fitment Compatibility | EXB-series 1.5" modular pneumatic motor sections |
| Primary Material | Anodized Aluminum Casting / Ductile Iron option |
| Function | Acts as the main pressure vessel body that houses the primary air distribution shifting spools |
| Operating Pressure | Engineered for safe continuous handling up to 125 PSI (8.6 Bar) supply lines |
Product Documents
0
No documents available for this product.
Terms & Conditions
Ratings & Reviews
12 verified review(s) • 100% recommend this product
V
Vimal Singh
✓ Verified
26 Aug 2026
★★★★★
Durable Material
Excellent material choice makes this highly robust.
Water
Sewage lift stations
Less than 1 month
📍 Dhanbad
P
Prabhu B
✓ Verified
07 Aug 2026
★★★★★
Prompt Logistics
The shipment reached our location rapidly and intact.
Mining
Underground utility clearing
Over 1 year
📍 Tuticorin
R
Rajesh Gupta
✓ Verified
06 Aug 2026
★★★★★
User Friendly
Simple categorization and easy-to-use search parameters.
Mining
Explosive slurry loading
1–6 months
📍 Chennai