International Shipping / Enquiries
Tell us what you need and our team will reply within 24 hours.
📐 Product Angles & Views
3D View / Front
Left Side
Right Side
Top Side
Product Video
PILOT VALVE ASSY. - EXB
Part No: B095.110.000
Pack of 1
B095.110.000: PILOT VALVE ASSY. - EXB – A complete pilot valve housing sub-assembly that senses mechanical stroke completions to trigger and shift the primary air motor block.
B095.110.000: PILOT VALVE ASSY. - EXB – A complete pilot valve housing sub-assembly that senses mechanical stroke completions to trigger and shift the primary air motor block.
Key Features
- Master internal shifting assembly engineered to regulate alternating pneumatic drive strokes.
- Low-friction construction to ensure rapid, unhindered mechanical pilot shifting responses.
- Minimized internal clear tolerances completely eliminate pressure bleeding inside the manifold block.
- Heavy-duty housing layout shields delicate internal spools from dirty or oily plant shop air.
- Standardized EXB series footprint integrates cleanly with original equipment center blocks.
Technical Specifications
| Manufacturer / Brand | Blagdon Pump |
| Component Classification | Complete Pilot Shifting Air Valve Assembly |
| Primary Material | Hard-Anodized Aluminum Body / Low-friction composite spools |
| Operating Pressure | 10 to 125 PSI (0.7 to 8.6 Bar) activation range |
| Mechanical Activation Stroke | 0.25 inches (6.35 mm) total actuator pin travel displacement |
| Internal Port Sizing | 1/8" NPT internal pilot circuit signal port channels |
Product Documents
0
No documents available for this product.
Terms & Conditions
Ratings & Reviews
12 verified review(s) • 100% recommend this product
A
Anjali Goel
✓ Verified
01 Aug 2026
★★★★★
Highly Economical
Affordable rates cut down our overall project overhead.
Chemical
Tanker offloading
1–6 months
📍 Pune
M
Manish Malhotra
✓ Verified
30 Jun 2026
★★★★★
Damage Free Logistics
Handled carefully with no signs of transit impact.
Chemical
Descaling line supply
1–6 months
📍 Delhi
A
Ananya Sharma
✓ Verified
19 Jun 2026
★★★★★
Perfect Tracking
Real-time updates provided accurate milestone visibility.
Chemical
Plating bath replenishment
Less than 1 month
📍 Thane