International Shipping / Enquiries
Tell us what you need and our team will reply within 24 hours.
📐 Product Angles & Views
3D View / Front
Left Side
Right Side
Top Side
Product Video
DIAPHRAGM EPDM (1 40 50 08)
Part No: 1 40 50 08
Pack of 1
1 40 50 08: DIAPHRAGM EPDM (1 40 50 08) – A flexible 1-inch rubber pumping diaphragm made of EPDM, ideal for transferring water, dilute acids, alkalis, and general industrial waste fluids.
1 40 50 08: DIAPHRAGM EPDM (1 40 50 08) – A flexible 1-inch rubber pumping diaphragm made of EPDM, ideal for transferring water, dilute acids, alkalis, and general industrial waste fluids.
Key Features
- Premium EPDM rubber formulation offering excellent flexibility and ozone resistance.
- Ideal for water, mild chemicals, and general utility transfer fluid processing applications.
- High tensile strength and tear resistance during unexpected process pressure spikes.
- Cost-effective elastomeric option that avoids chemical swelling when running non-petroleum fluids.
- Concentric structural ring molding distributes flexing stress evenly to extend runtime hours.
Technical Specifications
| Manufacturer / Brand | Dellmeco Pump |
| Component Classification | Industrial Flexing Chamber Elastomer Diaphragm |
| Pump Fitment Compatibility | Mid-range process pump utility loops |
| Primary Material | EPDM Rubber (Ethylene Propylene Diene Monomer) |
| Function | Displaces liquid volume inside the pump chamber during active cycling phases |
| Chemical Resistance | Excellent resistance to ketones, alcohols, and dilute acids; poor for oils |
| Operating Temperature | -40°F to 250°F (-40°C to 121°C) |
Product Documents
0
No documents available for this product.
Terms & Conditions
Ratings & Reviews
12 verified review(s) • 100% recommend this product
M
Mohit Pandey
✓ Verified
01 Aug 2026
★★★★★
Prompt Feedback
Received helpful, comprehensive answers within minutes.
Paint
Glue packaging
Over 1 year
📍 Surat
N
Naman Kumar
✓ Verified
06 Jul 2026
★★★★★
Flawless Operation
Smooth execution and zero issues since installation.
Water
Carbon slurry pumping
1–6 months
📍 Patna
P
Prakash Dubey
✓ Verified
08 Jun 2026
★★★★★
Knowledgeable Team
Clear explanations made complex configurations easy to understand.
Paint
Spray booth extraction
Less than 1 month
📍 Lucknow