International Shipping / Enquiries
Tell us what you need and our team will reply within 24 hours.
📐 Product Angles & Views
3D View / Front
Left Side
Right Side
Top Side
Product Video
CENTER HOUSING SEAL PE (1 50 85 22)
Part No: 1 50 85 22
Pack of 1
1 50 85 22: CENTER HOUSING SEAL PE (1 50 85 22) – A large Polyethylene profile gasket designed to isolate internal pressure zones inside high-capacity pneumatic pump housings.
1 50 85 22: CENTER HOUSING SEAL PE (1 50 85 22) – A large Polyethylene profile gasket designed to isolate internal pressure zones inside high-capacity pneumatic pump housings.
Key Features
- Molded polyethylene (PE) matrix engineered to tightly seal center air housing split lines.
- Provides a strong mechanical barrier against ambient humidity and industrial shop dust.
- Resists structural flattening and cold flow deformation under continuous factory torque limits.
- Chemically inert compound unaffected by common industrial plant washdown cleaners.
- Pre-formed contour matches the exact housing footprint to eliminate manual trimming steps.
Technical Specifications
| Manufacturer / Brand | Dellmeco Pump |
| Component Classification | Static Circuit Profile Joint Face Seal |
| Pump Fitment Compatibility | Large-bore non-metallic modular air motor divisions |
| Primary Material | Polyethylene (PE) Profile / Specialized Thermoplastic Elastomer |
| Function | Isolates primary internal air-shifting chambers from venting to external atmosphere |
| Structural Max Pressure | 125 PSI (8.6 Bar) maximum isolation rating |
| Operating Temperature | 32°F to 150°F (0°C to 66°C) |
Product Documents
0
No documents available for this product.
Terms & Conditions
Ratings & Reviews
13 verified review(s) • 100% recommend this product
S
Siddharth Das
✓ Verified
28 Sep 2026
★★★★
Highly Reliable
It works perfectly and performs exactly as advertised.
Paint
Solvent recovery distillation
Less than 1 month
📍 Kalyan-Dombivli
M
Madhav Gaikwad
✓ Verified
31 Aug 2026
★★★★
Fast Transit Time
Delivered ahead of schedule in excellent condition.
Water
Seawater intake priming
6–12 months
📍 Ranchi
K
Kamal Chauhan
✓ Verified
02 Aug 2026
★★★★
Intuitive Interface
Clean layout makes navigation extremely straightforward.
Water
Sewage lift stations
Less than 1 month
📍 Uttar Pradesh