International Shipping / Enquiries
Tell us what you need and our team will reply within 24 hours.
📐 Product Angles & Views
3D View / Front
Left Side
Right Side
Top Side
Product Video
BALL VALVE FLANGED 2" (GM400-CF8M (50))
Part No: GM400-CF8M (50)
Pack of 1
GM400-CF8M (50): BALL VALVE FLANGED 2" (GM400-CF8M (50)) – A heavy-capacity 2-inch (DN50) flanged fluid isolation ball valve made of CF8M stainless steel, built to isolate high-volume industrial pipelines.
GM400-CF8M (50): BALL VALVE FLANGED 2" (GM400-CF8M (50)) – A heavy-capacity 2-inch (DN50) flanged fluid isolation ball valve made of CF8M stainless steel, built to isolate high-volume industrial pipelines.
Key Features
- Large-bore 2-inch flanged process valve engineered for high-capacity bulk liquid transfer streams.
- Rugged cast CF8M steel composition provides ultimate structural rigidity against harsh pipeline torque.
- Micro-polished internal closing ball checks liquid flow cleanly while neutralizing fluid turbulence paths.
- Sealed stem configuration blocks dangerous process chemical mediums or vapors from escaping out to the room.
- Rated for highly demanding severe-duty applications, industrial skid arrays, and process processing loops.
Technical Specifications
| Manufacturer / Brand | General Machine / Industrial Process Valve Brand |
| Component Classification | 2-Inch High-Capacity Flanged Process Ball Valve |
| Valve Body Material | Investment Cast CF8M (316 Stainless Steel) |
| Connection Port Interface | 2-Inch ANSI Class 150 Raised Face (RF) Flange |
| Structural Pressure Class | Rated for working liquid isolation paths up to 275 PSI |
| Primary Applications | Bulk industrial fluid transfer manifolds and chemical distribution mains |
Product Documents
0
No documents available for this product.
Terms & Conditions
Ratings & Reviews
8 verified review(s) • 100% recommend this product
R
Ramesh Pillai
✓ Verified
05 Aug 2026
★★★★
Excellent Support
Quick polite response.
Marine
Bilge water and ballast tank fluid management lines
6–12 months
📍 Pimpri-Chinchwad
A
Aarav Sen
✓ Verified
25 Apr 2026
★★★★
Tracked Seamlessly
Updates were accurate.
Mining
Isolation of abrasive mine dewatering and slurry pipelines
1–6 months
📍 Kolkata
A
Ananya Mehta
✓ Verified
22 Feb 2026
★★★★
Clear Diagrams
Charts highly helpful.
Chemical
Shutting off hazardous, volatile storage tank bottom drains
6–12 months
📍 Kanpur