A
Abhishek Shukla
β Verified
30 Apr 2026 β’ Over 1 year β’ π Jabalpur
β
β
β
β
β
ASSY, AIR VALVE , PS 4-15
βΉ 27,247
View β
Confusing Interface
Website was difficult to navigate and use.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Jabalpur
Quality 4/5
Delivery 4/5
R
Ramesh Agarwal
β Verified
30 Apr 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
DIAPHRAGM, PRIMARY, FDA EPDM
βΉ 5,565
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Resin transfer
π Pune
Quality 4/5
Delivery 4/5
A
Ansh Chatterjee
β Verified
30 Apr 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
Seat, Valve, Neoprene
βΉ 581
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Pharmaceutical & Cosmetics
βοΈ Aerosol propellant feed
π Vadodara
Quality 4/5
Delivery 4/5
M
Mayank Pandey
β Verified
30 Apr 2026 β’ 6β12 months β’ π Aurangabad
β
β
β
β
β
Diaphragm Primary EPDM
βΉ 3,297
View β
Delayed Delivery
Package arrived much later than promised.
π Food and Beverage
βοΈ Vinegar bottling
π Aurangabad
Quality 4/5
Delivery 4/5
J
Janarthanan A
β Verified
30 Apr 2026 β’ Over 1 year β’ π Chennai
β
β
β
β
β
Seat, Valve, Buna
βΉ 508
View β
Broken Links On Site
Several search features did not load properly.
π Pharmaceutical & Cosmetics
βοΈ Fermentation broth harvesting
π Chennai
Quality 4/5
Delivery 4/5
R
Rahul Nair
β Verified
30 Apr 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
Manifold, Inlet
βΉ 20,408
View β
Damaged Packaging
Box was torn up and items were loose.
π Mining and Construction
βοΈ Heap leach pumping
π Lucknow
Quality 4/5
Delivery 4/5
A
Aarav Singh
β Verified
30 Apr 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
O-RING (2.359 X .139), NORDEL
βΉ 43
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Water and Wastewater Treatment
βοΈ Sump dewatering
π Vadodara
Quality 4/5
Delivery 4/5
P
Priya Kulkarni
β Verified
30 Apr 2026 β’ Less than 1 month β’ π Hyderabad
β
β
β
β
β
Diaphragm Primary Polyurethane
βΉ 1,600
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Hyderabad
Quality 4/5
Delivery 4/5
H
Harish Joshi
β Verified
30 Apr 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
MANIFOLD, INLET ADV NPT
βΉ 3,043
View β
Defective Out of Box
Item failed to work on the first try.
π Paint, Ink, and Coatings
βοΈ Coating emulsion transfer
π Visakhapatnam
Quality 4/5
Delivery 4/5
D
Deepak Das
β Verified
30 Apr 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
Piston, Inner, T2, Turbo, Rubr
βΉ 90
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Paint, Ink, and Coatings
βοΈ Filter press recirculation
π Lucknow
Quality 4/5
Delivery 4/5