R
Ramesh Dubey
β Verified
14 Sep 2026 β’ Over 1 year β’ π Jaipur
β
β
β
β
β
AIR FILTER REGULATOR WITH PRESSURE GAUGE - AFT PORT SIZE 1/2"
βΉ 1,934
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Water and Wastewater Treatment
βοΈ Digester cleaning
π Jaipur
Quality 4/5
Delivery 4/5
D
Darshan Nair
β Verified
14 Sep 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
SEALING INLET/ OUTLET-FEP/FPM (2 15 70 04)
βΉ 3,872
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Polymer dosing
π Chennai
Quality 4/5
Delivery 4/5
S
Sivaanand D
β Verified
14 Sep 2026 β’ Less than 1 month β’ π Tuticorin
β
β
β
β
β
SS BRAIDED HOSE PIPE 1" RF FLANGED ON BOTH ENDS (LENGTH 1M)
βΉ 3,266
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Oil and Gas
βοΈ Superheated steam lines for refinery cleaning and heating
π Tuticorin
Quality 4/5
Delivery 4/5
V
Vivek Trivedi
β Verified
14 Sep 2026 β’ 6β12 months β’ π Guwahati
β
β
β
β
β
VALVE BALL EPDM - 1" (1A-080)
βΉ 3,610
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Pharmaceutical & Cosmetics
βοΈ Lipstick wax transfer
π Guwahati
Quality 4/5
Delivery 4/5
S
Shikhar Kumar
β Verified
14 Sep 2026 β’ 6β12 months β’ π Vadodara
β
β
β
β
β
VALVE SEAT PLATE-SS - EXB
βΉ 4,668
View β
Defective Design
Failed under standard load conditions within days.
π Chemical Processing
βοΈ Filter press feeding
π Vadodara
Quality 4/5
Delivery 4/5
V
Vetrivel Nathan
β Verified
14 Sep 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
VALVE BALL - 1/2" (15-014)
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Chemical Processing
βοΈ Fertilizer blending
π Chennai
Quality 4/5
Delivery 4/5
S
Sandeep Chauhan
β Verified
14 Sep 2026 β’ 1β6 months β’ π Hubli-Dharwad
β
β
β
β
β
PLATE SEAL-1/4' (06-059)
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Hubli-Dharwad
Quality 3/5
Delivery 3/5
N
Nishant Dutta
β Verified
14 Sep 2026 β’ 6β12 months β’ π Aurangabad
β
β
β
β
β
O-RING FPM (1 08 080 09)
βΉ 847
View β
Delayed Feedback
Took several business days to receive a generic response.
π Pharmaceutical & Cosmetics
βοΈ Buffer solution transfer
π Aurangabad
Quality 3/5
Delivery 3/5
M
Mukesh Mehta
β Verified
14 Sep 2026 β’ 6β12 months β’ π Chandigarh
β
β
β
β
β
CENTER HOUSING SEAL (1 25 85 22)
βΉ 847
View β
Missing Details
Critical item specifications are omitted from the page.
π Chemical Processing
βοΈ Tanker offloading
π Chandigarh
Quality 4/5
Delivery 4/5
S
Sneha Bajaj
β Verified
13 Sep 2026 β’ Less than 1 month β’ π Pimpri-Chinchwad
β
β
β
β
β
Manifold, Inlet, Footed
βΉ 12,394
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5