S
Sanjay Ghosh
β Verified
07 Sep 2026 β’ Less than 1 month β’ π Vasai-Virar
β
β
β
β
β
CLAMP BAND, SMALL - NESTED
βΉ 4,019
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Odorous chemical feed
π Vasai-Virar
Quality 4/5
Delivery 4/5
V
Vetriselvan Vel
β Verified
07 Sep 2026 β’ Less than 1 month β’ π Ranipet
β
β
β
β
β
Piston, Outer, (Non-Ptfe)
βΉ 912
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Ranipet
Quality 4/5
Delivery 4/5
V
Vimal Deshmukh
β Verified
07 Sep 2026 β’ Less than 1 month β’ π Kalyan-Dombivli
β
β
β
β
β
Chamber, Air, P4, Dc Alum
βΉ 3,675
View β
Confusing Interface
Website was difficult to navigate and use.
π Pharmaceutical & Cosmetics
βοΈ Gel-cap gelatin feed
π Kalyan-Dombivli
Quality 4/5
Delivery 4/5
S
Shikhar Patil
β Verified
07 Sep 2026 β’ 6β12 months β’ π Varanasi
β
β
β
β
β
SEAT, VALUE, BOLTED, SS
βΉ 5,390
View β
Delayed Delivery
Package arrived much later than promised.
π Pharmaceutical & Cosmetics
βοΈ Saline formulation transfer
π Varanasi
Quality 4/5
Delivery 4/5
S
Sanket Naidu
β Verified
07 Sep 2026 β’ Over 1 year β’ π Uttar Pradesh
β
β
β
β
β
DIAPHRAGM, PRIMARY, UF, NORDEL
βΉ 5,913
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Sealant dispensing
π Uttar Pradesh
Quality 4/5
Delivery 4/5
R
Ramesh Joshi
β Verified
07 Sep 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
MUFFLER PLATE, P1/P2
βΉ 1,238
View β
Confusing Interface
Website was difficult to navigate and use.
π Mining and Construction
βοΈ Roadway runoff dewatering
π Mumbai
Quality 4/5
Delivery 4/5
A
Alok Sharma
β Verified
07 Sep 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
ELBOW, DISCHARGE MANIFOLD
βΉ 1,381
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Lucknow
Quality 4/5
Delivery 4/5
A
Aakash Goel
β Verified
07 Sep 2026 β’ 1β6 months β’ π Nagpur
β
β
β
β
β
O-RING, (1.109 X.139)BUNA,UL
βΉ 63
View β
Poor Quality Control
The item felt cheap and fell short.
π Chemical Processing
βοΈ Tank circulation
π Nagpur
Quality 4/5
Delivery 4/5
K
Kunal Choudhury
β Verified
07 Sep 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
DIAPHRAGM, PRIMARY, H200
βΉ 1,047
View β
Defective Out of Box
Item failed to work on the first try.
π Chemical Processing
βοΈ Sump evacuation
π Visakhapatnam
Quality 4/5
Delivery 4/5
S
Sneha Patel
β Verified
07 Sep 2026 β’ Over 1 year β’ π Mumbai
β
β
β
β
β
Piston, Outer, (Non-Ptfe)
βΉ 643
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Mumbai
Quality 4/5
Delivery 4/5