A
Ayush Joshi
β Verified
20 Aug 2026 β’ 1β6 months β’ π Meerut
β
β
β
β
β
VALVE CHEST - EXB
βΉ 14,250
View β
Inconsistent Output
Performance varies wildly and lacks precision controls.
π Mining and Construction
βοΈ Tunneling drainage
π Meerut
Quality 4/5
Delivery 4/5
K
Karan Solanki
β Verified
20 Aug 2026 β’ Over 1 year β’ π Dhanbad
β
β
β
β
β
SEALING INLET/ OUTLET SET (2 25 73 17)
βΉ 1,452
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Mining and Construction
βοΈ Conveyor sump cleanout
π Dhanbad
Quality 4/5
Delivery 4/5
A
Aavya Naik
β Verified
20 Aug 2026 β’ Over 1 year β’ π Jaipur
β
β
β
β
β
DAMPENER TIE ROD SS316 (8 50 542 50)
βΉ 2,541
View β
Incomplete Package
Several vital components were missing from the order box.
π Paint, Ink, and Coatings
βοΈ Hot melt pre-heating
π Jaipur
Quality 4/5
Delivery 4/5
H
Harish Dubey
β Verified
20 Aug 2026 β’ Less than 1 month β’ π Jaipur
β
β
β
β
β
SLIDE VALVE PLATE 2" (50-248)
βΉ 9,837
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Water and Wastewater Treatment
βοΈ Sludge dewatering
π Jaipur
Quality 4/5
Delivery 4/5
L
Lalit Pillai
β Verified
20 Aug 2026 β’ Less than 1 month β’ π Ghaziabad
β
β
β
β
β
DIAPHRAGM SANTOPRENE - 1" (25-045)
βΉ 6,469
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Paint, Ink, and Coatings
βοΈ Screen printing ink
π Ghaziabad
Quality 4/5
Delivery 4/5
R
Ramasamy U
β Verified
20 Aug 2026 β’ Over 1 year β’ π Hosur
β
β
β
β
β
AIR VALVE SLEEVE & SPOOL SET -EXB (031.139.000)
βΉ 14,328
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Mining and Construction
βοΈ Truck wash evacuation
π Hosur
Quality 4/5
Delivery 4/5
V
Vimal Shinde
β Verified
20 Aug 2026 β’ 6β12 months β’ π Kota
β
β
β
β
β
CENTER HOUSING SEAL PE (1 40 85 22)
βΉ 968
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Paint, Ink, and Coatings
βοΈ Binder resin transfer
π Kota
Quality 4/5
Delivery 4/5
D
Dharun Sundaram
β Verified
20 Aug 2026 β’ 6β12 months β’ π Hosur
β
β
β
β
β
BUMP STOP (1B-015)
βΉ 4,485
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Paint, Ink, and Coatings
βοΈ Solvent recovery distillation
π Hosur
Quality 4/5
Delivery 4/5
S
Sanket Kulkarni
β Verified
20 Aug 2026 β’ Over 1 year β’ π Raipur
β
β
β
β
β
SLIDE VALVE (1A-025)
βΉ 4,376
View β
Frequent Errors
The online portal lags significantly during processing.
π Paint, Ink, and Coatings
βοΈ Color kitchens washdown
π Raipur
Quality 4/5
Delivery 4/5
S
Subhash Chatterjee
β Verified
20 Aug 2026 β’ Less than 1 month β’ π Howrah
β
β
β
β
β
GPI HAND PUMP-100 UL (114000-10)
βΉ 16,500
View β
Frequent Errors
The online portal lags significantly during processing.
π Water and Wastewater Treatment
βοΈ Cooling Tower Water Make-Up
π Howrah
Quality 4/5
Delivery 4/5