P
Pankaj Jadav
β Verified
12 Aug 2026 β’ 1β6 months β’ π Gwalior
β
β
β
β
β
O-RING FOR CENTER HOUSING SEAL (1 25 85 10)
βΉ 363
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Solvent extraction
π Gwalior
Quality 4/5
Delivery 4/5
C
Chetan Reddy
β Verified
12 Aug 2026 β’ Less than 1 month β’ π Hubli-Dharwad
β
β
β
β
β
VALVE BLOCK PLUG 1/2" (15-011)
View β
No Bulk Incentive
Wholesale pricing structures offer negligible budget savings.
π Food and Beverage
βοΈ Bakery batter feeding
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
A
Anil Shah
β Verified
11 Aug 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
P2 NBR PHE GASKET
βΉ 494
View β
Warning. Poor Durability
Broke days normal.
π Marine & Shipyard
βοΈ Low-Creep Marine Gaskets
π Indore
Quality 4/5
Delivery 4/5
R
Ravi Pillai
β Verified
11 Aug 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
BALL VALVE FLANGED 1" (GM400-CF8M (25))
View β
Warning. Flimsy Material
Cheap fit loose.
π Food and Beverage
βοΈ Controlling bulk flow of edible oils from storage tanks
π Lucknow
Quality 4/5
Delivery 4/5
R
Riya Das
β Verified
10 Aug 2026 β’ 6β12 months β’ π Bengaluru
β
β
β
β
β
OBL DIAPHRAGM METERING PUMP (M16ASV)
βΉ 71,208
View β
Not good. Wrong Specs
Dimensions slightly off.
π Oil and Gas
βοΈ Injecting highly specific magnesium oxide slurries into diesel fuel lines
π Bengaluru
Quality 4/5
Delivery 4/5
A
Anil Pillai
β Verified
06 Aug 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
AIR HOSE
View β
Warning. Too Expensive
Inflated market standard.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Hyderabad
Quality 4/5
Delivery 4/5
A
Arjun Verma
β Verified
06 Aug 2026 β’ 1β6 months β’ π Bhopal
β
β
β
β
β
M10B SS PHE Plates
βΉ 3,370
View β
Unavailable Cert Documents
Support failed to deliver material cert papers for audit.
π Marine & Shipyard
βοΈ Boiler Blowdown Recovery
π Bhopal
Quality 4/5
Delivery 4/5
R
Rajesh Pillai
β Verified
03 Aug 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
P2 SS PHE PLATES
βΉ 2,036
View β
Warning. Broken Search
Search returns irrelevant.
π Chemical Processing
βοΈ Desalting Water Preheat
π Visakhapatnam
Quality 4/5
Delivery 4/5
R
Ridhima Khanna
β Verified
03 Aug 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
BALL VALVE FLANGED 1.5" (GM400-CF8M (40))
View β
Beware! Poor Value
Low quality overpriced.
π Water and Wastewater Treatment
βοΈ Flow isolation in high-pressure desalination intake systems
π Chennai
Quality 4/5
Delivery 4/5
T
Tanvi Bose
β Verified
02 Aug 2026 β’ 1β6 months β’ π Delhi
β
β
β
β
β
COMPUTER DISPLAY (G2X05XR9LMA)
βΉ 22,619
View β
Disappointed. Inaccurate Fitment
Fit guide wrong.
π Oil and Gas
βοΈ Kerosene Distribution
π Delhi
Quality 4/5
Delivery 4/5