A
Anjali Naik
β Verified
01 Aug 2026 β’ Less than 1 month β’ π Mumbai
β
β
β
β
β
END CAP, P1/P2
βΉ 762
View β
Damaged Packaging
Box was torn up and items were loose.
π Food and Beverage
βοΈ Syrup tank unloading
π Mumbai
Quality 4/5
Delivery 4/5
V
Vijay Mehta
β Verified
01 Aug 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
Gasket, Muffler Plate,T2 Metal
βΉ 102
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Heap leach pumping
π Thane
Quality 4/5
Delivery 4/5
A
Arjun Bose
β Verified
01 Aug 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
BALL, VALVE, EPDM, ADV
βΉ 493
View β
Confusing Interface
Website was difficult to navigate and use.
π Water and Wastewater Treatment
βοΈ Membrane CIP feeding
π Chennai
Quality 4/5
Delivery 4/5
S
Suresh Jadav
β Verified
01 Aug 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
Chamber, Liquid
βΉ 1,170
View β
Delayed Delivery
Package arrived much later than promised.
π Food and Beverage
βοΈ Sauce batching
π Chennai
Quality 4/5
Delivery 4/5
P
Pooja Srivastava
β Verified
01 Aug 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
O-Ring, (.990 X.148)Wf,M2R
βΉ 68
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Paint, Ink, and Coatings
βοΈ Coating emulsion transfer
π Chennai
Quality 4/5
Delivery 4/5
P
Prem Das
β Verified
01 Aug 2026 β’ 6β12 months β’ π Uttar Pradesh
β
β
β
β
β
Manifold, Discharge, P200 Bsp
βΉ 3,607
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Digester cleaning
π Uttar Pradesh
Quality 4/5
Delivery 4/5
R
Reyansh Trivedi
β Verified
01 Aug 2026 β’ 1β6 months β’ π Nagpur
β
β
β
β
β
Air Valve Gasket
βΉ 16
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Food and Beverage
βοΈ Dairy product handling
π Nagpur
Quality 4/5
Delivery 4/5
A
Arjun Pillai
β Verified
01 Aug 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
WET SIDE KIT - EXB
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Grout injection
π Lucknow
Quality 4/5
Delivery 4/5
S
Suresh Grover
β Verified
01 Aug 2026 β’ 1β6 months β’ π Bengaluru
β
β
β
β
β
Diaphragm, Back-Up, Neoprene - MOC: Rubber; Spa
βΉ 1,043
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Water and Wastewater Treatment
βοΈ Alum dosing
π Bengaluru
Quality 4/5
Delivery 4/5
S
Sunil Deshmukh
β Verified
01 Aug 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
Diaphragm Primary Wilflex
βΉ 295
View β
Unhelpful Support
Took days to get a generic email reply.
π Paint, Ink, and Coatings
βοΈ Stain blending
π Hyderabad
Quality 4/5
Delivery 4/5