R
Ravi Pillai
β Verified
20 Jul 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
SLIDE VALVE - EXB (50-251)
βΉ 6,465
View β
Inconsistent Output
Performance varies wildly and lacks precision controls.
π Paint, Ink, and Coatings
βοΈ Can coating circulation
π Lucknow
Quality 4/5
Delivery 4/5
J
Jatin Das
β Verified
20 Jul 2026 β’ 1β6 months β’ π Srinagar
β
β
β
β
β
VALVE CHEST - EXB
βΉ 14,250
View β
Inflated Rates
Standard item cost feels artificially high for businesses.
π Mining and Construction
βοΈ Pond silt dredging
π Srinagar
Quality 4/5
Delivery 4/5
R
Rishi Gupta
β Verified
20 Jul 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
SLIDE VALVE (1A-025)
βΉ 4,376
View β
Hardware Glitch
Stopped responding during initial operational tests.
π Chemical Processing
βοΈ Tanker offloading
π Mumbai
Quality 4/5
Delivery 4/5
Y
Yogesh Joshi
β Verified
20 Jul 2026 β’ Over 1 year β’ π Kalyan-Dombivli
β
β
β
β
β
SHAFT ALLEN PIN SCREW AISI 304 (1 15 540 50)
βΉ 484
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Mining and Construction
βοΈ Filter cake washing
π Kalyan-Dombivli
Quality 4/5
Delivery 4/5
S
Surendra Joshi
β Verified
20 Jul 2026 β’ 6β12 months β’ π Nashik
β
β
β
β
β
GPI HAND PUMP-100 UL (114000-10)
βΉ 16,500
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Oil and Gas
βοΈ Hydraulic Fluid Fill Stations
π Nashik
Quality 4/5
Delivery 4/5
P
Prakash Iyer
β Verified
20 Jul 2026 β’ Less than 1 month β’ π Vijayawada
β
β
β
β
β
BUMP STOP (1B-015)
βΉ 4,485
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Water and Wastewater Treatment
βοΈ Dechlorination agent feed
π Vijayawada
Quality 4/5
Delivery 4/5
S
Somesh Mehta
β Verified
20 Jul 2026 β’ 1β6 months β’ π Amritsar
β
β
β
β
β
VALVE BALL HYGIENIC - 1/2" (15-174)
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Chemical Processing
βοΈ Hazardous waste packaging
π Amritsar
Quality 4/5
Delivery 4/5
A
Anurag Roy
β Verified
20 Jul 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
AIR VALVE ASSEMBLY (031.140.000)
View β
Overpriced Service
The cost is far too premium compared to alternatives.
π Mining and Construction
βοΈ Mine shaft dewatering
π Nagpur
Quality 4/5
Delivery 4/5
G
Govind Reddy
β Verified
20 Jul 2026 β’ Over 1 year β’ π Bengaluru
β
β
β
β
β
DIAPHARGM TEFLON 1/4" (06-141)
βΉ 3,505
View β
Incomplete Package
Several vital components were missing from the order box.
π Pharmaceutical & Cosmetics
βοΈ Mouthwash batching
π Bengaluru
Quality 3/5
Delivery 3/5
P
Pradeep Shankar
β Verified
20 Jul 2026 β’ Less than 1 month β’ π Ranipet
β
β
β
β
β
O-RING NBR (1 40 87 10)
βΉ 363
View β
Defective Design
Failed under standard load conditions within days.
π Chemical Processing
βοΈ Tanker offloading
π Ranipet
Quality 4/5
Delivery 4/5