A
Aarav Shukla
β Verified
11 Jul 2026 β’ Over 1 year β’ π Vijayawada
β
β
β
β
β
VALVE SEAT PLATE-SS - EXB
βΉ 4,668
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Chemical Processing
βοΈ Tank circulation
π Vijayawada
Quality 4/5
Delivery 4/5
K
Karthik Gaikwad
β Verified
11 Jul 2026 β’ Less than 1 month β’ π Hubli-Dharwad
β
β
β
β
β
VALVE BALL VITON (1A-081)
βΉ 4,023
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Mining and Construction
βοΈ Concrete batch water
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
U
Utkarsh Dutta
β Verified
11 Jul 2026 β’ 1β6 months β’ π Agra
β
β
β
β
β
VALVE BALL - 1/2" (15-014)
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Paint, Ink, and Coatings
βοΈ Filling machine supply
π Agra
Quality 4/5
Delivery 4/5
C
Chetan Sharma
β Verified
11 Jul 2026 β’ Less than 1 month β’ π Faridabad
β
β
β
β
β
DIAPHRAGM PTFE (1 08 5005)
βΉ 8,107
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Paint, Ink, and Coatings
βοΈ Ink press recirculation
π Faridabad
Quality 3/5
Delivery 3/5
A
Ayush Kulkarni
β Verified
11 Jul 2026 β’ 1β6 months β’ π Allahabad
β
β
β
β
β
SS BRAIDED HOSE PIPE 1.5" RF FLANGED ON BOTH ENDS (LENGTH 1M)
βΉ 5,403
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Food and Beverage
βοΈ High-temperature steam and chemical CIP washdowns
π Allahabad
Quality 4/5
Delivery 4/5
V
Vishal Mishra
β Verified
11 Jul 2026 β’ 1β6 months β’ π Ludhiana
β
β
β
β
β
AIR VALVE PET/NBR
βΉ 26,569
View β
Missing Details
Critical item specifications are omitted from the page.
π Pharmaceutical & Cosmetics
βοΈ Cosmetic clay masks
π Ludhiana
Quality 4/5
Delivery 4/5
M
Mukesh Deshmukh
β Verified
11 Jul 2026 β’ Less than 1 month β’ π Kota
β
β
β
β
β
PLATE SEAL-1/4' (06-059)
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Kota
Quality 3/5
Delivery 3/5
R
Rahul Chatterjee
β Verified
09 Jul 2026 β’ 1β6 months β’ π Surat
β
β
β
β
β
O-RING FEP ENDCAP SILICONE - EXB
βΉ 1,920
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Paint, Ink, and Coatings
βοΈ Dye metering
π Surat
Quality 4/5
Delivery 4/5
J
Jatin Kumar
β Verified
09 Jul 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
O-RING BUNA N-EXB
βΉ 47
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Pharmaceutical & Cosmetics
βοΈ Nail polish filling
π Delhi
Quality 4/5
Delivery 4/5
V
Vijay Joshi
β Verified
09 Jul 2026 β’ 6β12 months β’ π Pimpri-Chinchwad
β
β
β
β
β
O-RING - EXB
βΉ 185
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Pharmaceutical & Cosmetics
βοΈ Face wash scrub
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5