V
Vivaan Nair
β Verified
11 Jun 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
Seat, Valve, Kynar
βΉ 373
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Fly ash slurry
π Mumbai
Quality 4/5
Delivery 4/5
A
Anil Choudhury
β Verified
11 Jun 2026 β’ Less than 1 month β’ π Surat
β
β
β
β
β
AIR SIDE KIT(1/2"-OLD MODEL) - EXB
View β
Defective Out of Box
Item failed to work on the first try.
π Paint, Ink, and Coatings
βοΈ Color kitchens washdown
π Surat
Quality 4/5
Delivery 4/5
R
Reyansh Singh
β Verified
11 Jun 2026 β’ 6β12 months β’ π Vadodara
β
β
β
β
β
Shaft
βΉ 555
View β
Unhelpful Support
Took days to get a generic email reply.
π Chemical Processing
βοΈ Scrubber fluid circulation
π Vadodara
Quality 4/5
Delivery 4/5
V
Verified Buyer
β Verified
11 Jun 2026 β’ 1β6 months β’ π Delhi
β
β
β
β
β
DIAPHRAGM PTFE BACKUP - 2" (1B-054)
βΉ 7,200
View β
Delayed
Delivery was delayed, but the product quality was satisfactory
π Water and Wastewater Treatment
βοΈ Pumping abrasive sludges
π Delhi
Quality 3/5
Delivery 3/5
J
Jatin Saxena
β Verified
10 Jun 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
VALVE SEAT O'RING 3"
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Pharmaceutical & Cosmetics
βοΈ Pure water loop
π Chennai
Quality 4/5
Delivery 4/5
A
Ananya Rao
β Verified
10 Jun 2026 β’ Over 1 year β’ π Kanpur
β
β
β
β
β
O-RING PTFE-EXB
βΉ 474
View β
Defective Design
Failed under standard load conditions within days.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Kanpur
Quality 4/5
Delivery 4/5
G
Gaurav Jadav
β Verified
10 Jun 2026 β’ Less than 1 month β’ π Bhopal
β
β
β
β
β
PILOT VALVE ASSY. - EXB
βΉ 8,122
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Pharmaceutical & Cosmetics
βοΈ Biotech waste inactivation
π Bhopal
Quality 4/5
Delivery 4/5
V
Vikram Rao
β Verified
10 Jun 2026 β’ Less than 1 month β’ π Surat
β
β
β
β
β
FRONT PLATE ST (B612.193.110)
βΉ 31,963
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Surat
Quality 4/5
Delivery 4/5
S
Subhash Bajpai
β Verified
10 Jun 2026 β’ 6β12 months β’ π Srinagar
β
β
β
β
β
DIAPHARGM PTFE 3" (286.078.600)
βΉ 39,913
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Water and Wastewater Treatment
βοΈ Lime slurry transfer
π Srinagar
Quality 4/5
Delivery 4/5
I
Ishita Patel
β Verified
10 Jun 2026 β’ Less than 1 month β’ π Mumbai
β
β
β
β
β
BASE LEG
View β
No Bulk Incentive
Wholesale pricing structures offer negligible budget savings.
π Mining and Construction
βοΈ Grout injection
π Mumbai
Quality 4/5
Delivery 4/5