R
Rohan Mishra
β Verified
02 Jun 2026 β’ Less than 1 month β’ π Pune
β
β
β
β
β
FRONT PLATE (SA10502)
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Food and Beverage
βοΈ Bakery batter feeding
π Pune
Quality 4/5
Delivery 4/5
A
Aavya Shah
β Verified
02 Jun 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
O-RING, (.484X.139) WILFLEX
βΉ 46
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Bleach injection
π Nagpur
Quality 4/5
Delivery 4/5
P
Pranav Banerjee
β Verified
01 Jun 2026 β’ Over 1 year β’ π Mumbai
β
β
β
β
β
Omron S8FS-C35024 24 V 350 W SMPS
βΉ 3,000
View β
Damaged Terminal Strips
The box arrived crushed and three plastic terminal barrier strips on the controller board were broken off.
π Telecommunications
βοΈ Telematics
π Mumbai
Quality 4/5
Delivery 4/5
R
Rajesh Joshi
β Verified
31 May 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
SCREW, HHC, 5/8-11 X 2
βΉ 311
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Mining and Construction
βοΈ Concrete batch water
π Lucknow
Quality 4/5
Delivery 4/5
H
Harish Kumar
β Verified
31 May 2026 β’ Less than 1 month β’ π Pune
β
β
β
β
β
Air System 3ml Grease Pkt
View β
Damaged Packaging
Box was torn up and items were loose.
π Pharmaceutical & Cosmetics
βοΈ Mouthwash batching
π Pune
Quality 4/5
Delivery 4/5
P
Pooja Bose
β Verified
31 May 2026 β’ 1β6 months β’ π Bengaluru
β
β
β
β
β
BALL, VALVE, BUNA
βΉ 1,430
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Bengaluru
Quality 4/5
Delivery 4/5
S
Shreya Grover
β Verified
31 May 2026 β’ 1β6 months β’ π Indore
β
β
β
β
β
SHAFT, SOL,COMBO
βΉ 3,766
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Tank circulation
π Indore
Quality 4/5
Delivery 4/5
S
Santosh Sharma
β Verified
31 May 2026 β’ Over 1 year β’ π Visakhapatnam
β
β
β
β
β
GASKET, T-SECTION, 2" EHEDG
βΉ 297
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Concrete batch water
π Visakhapatnam
Quality 4/5
Delivery 4/5
D
Diya Tiwar
β Verified
31 May 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
Clamp Band, Small
βΉ 2,294
View β
Defective Out of Box
Item failed to work on the first try.
π Pharmaceutical & Cosmetics
βοΈ Aerosol propellant feed
π Delhi
Quality 4/5
Delivery 4/5
P
Pranav Shah
β Verified
31 May 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
Bolt, Rhsn, 5/16-18 X 1 1/2
βΉ 149
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Blood plasma fractioning
π Hyderabad
Quality 4/5
Delivery 4/5