D
Diya Pillai
β Verified
19 Apr 2026 β’ 6β12 months β’ π Kanpur
β
β
β
β
β
P2 EPDM PHE Gasket
βΉ 594
View β
NEW. System Disconnect
Database crashed checkout.
π Food and Beverage
βοΈ Glue-Free Snap-On Seals
π Kanpur
Quality 4/5
Delivery 4/5
M
Manish Mehta
β Verified
18 Apr 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
FLOW METER (G2S10TQ9GMA)
βΉ 85,000
View β
Warning. Broken Search
Search returns irrelevant.
π Oil and Gas
βοΈ Solvent Dispensing
π Hyderabad
Quality 4/5
Delivery 4/5
A
Anil Singh
β Verified
17 Apr 2026 β’ 1β6 months β’ π Delhi
β
β
β
β
β
INLET MANIFOLD
βΉ 14,007
View β
Not good. Wrong Specs
Dimensions slightly off.
π Mining and Construction
βοΈ Tunneling drainage
π Delhi
Quality 4/5
Delivery 4/5
A
Aditya Kulkarni
β Verified
16 Apr 2026 β’ 1β6 months β’ π Patna
β
β
β
β
β
Piston, Outer, (Ptfe)
βΉ 13,320
View β
Defective Out of Box
Item failed to work on the first try.
π Chemical Processing
βοΈ IBC transferring
π Patna
Quality 4/5
Delivery 4/5
R
Ravi Bajaj
β Verified
16 Apr 2026 β’ Over 1 year β’ π Visakhapatnam
β
β
β
β
β
AIR REPAIR KIT 3" - 4"
View β
Poor Quality Control
The item felt cheap and fell short.
π Food and Beverage
βοΈ Bakery batter feeding
π Visakhapatnam
Quality 4/5
Delivery 4/5
A
Aavya Das
β Verified
16 Apr 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
SEAT, VALVE, BUNA
βΉ 792
View β
Confusing Interface
Website was difficult to navigate and use.
π Chemical Processing
βοΈ Corrosive sampling
π Mumbai
Quality 4/5
Delivery 4/5
R
Rajesh Rao
β Verified
16 Apr 2026 β’ 6β12 months β’ π Lucknow
β
β
β
β
β
Diaphragm Primary Polyurethane
βΉ 5,696
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Seawater intake priming
π Lucknow
Quality 4/5
Delivery 4/5
S
Suresh Deshmukh
β Verified
16 Apr 2026 β’ 6β12 months β’ π Nagpur
β
β
β
β
β
CENTER BLOCK KIT, PX15, ALUM
βΉ 24,367
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Saline formulation transfer
π Nagpur
Quality 4/5
Delivery 4/5
S
Sanjay Das
β Verified
16 Apr 2026 β’ 1β6 months β’ π Jodhpur
β
β
β
β
β
BUSHING, CYLINDER PISTON
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Leachate recovery
π Jodhpur
Quality 4/5
Delivery 4/5
V
Vivaan Kulkarni
β Verified
16 Apr 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
SCREW, HFH, 3/8-16 X 1 1/4,GR8
βΉ 52
View β
Delayed Delivery
Package arrived much later than promised.
π Chemical Processing
βοΈ Sump evacuation
π Hyderabad
Quality 4/5
Delivery 4/5