A
Aarav Choudhury
β Verified
24 May 2026 β’ 6β12 months β’ π Pune
β
β
β
β
β
O-Ring (1.734 X .139),Nordel
βΉ 20
View β
Confusing Interface
Website was difficult to navigate and use.
π Chemical Processing
βοΈ Tanker offloading
π Pune
Quality 4/5
Delivery 4/5
V
Vihaan Pandey
β Verified
24 May 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
O-RING, (.734 X.139)BUNA
βΉ 6
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Aerosol propellant feed
π Visakhapatnam
Quality 4/5
Delivery 4/5
P
Pooja Bose
β Verified
24 May 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
Nut, Hex, 10-24
βΉ 22
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Tunneling drainage
π Bhopal
Quality 4/5
Delivery 4/5
A
Aditya Pillai
β Verified
24 May 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
SS 316 Flange 1.5-inch
βΉ 735
View β
Poor Quality Control
The item felt cheap and fell short.
π Oil and Gas
βοΈ Links high-pressure subsea umbilical control systems.
π Hyderabad
Quality 4/5
Delivery 4/5
N
Nikhil Khanna
β Verified
24 May 2026 β’ 1β6 months β’ π Kanpur
β
β
β
β
β
ASSY,SOLENOID,24V AC/12V DC,X
View β
Unhelpful Support
Took days to get a generic email reply.
π Mining and Construction
βοΈ Mine shaft dewatering
π Kanpur
Quality 4/5
Delivery 4/5
H
Harish Sharma
β Verified
24 May 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
CLAMP BAND, LARGE, NESTED
βΉ 1,746
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Mining and Construction
βοΈ Mine shaft dewatering
π Hyderabad
Quality 4/5
Delivery 4/5
A
Amit Choudhury
β Verified
23 May 2026 β’ 6β12 months β’ π Delhi
β
β
β
β
β
O-Ring, (2.359 X.139)Buna
βΉ 48
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Grout injection
π Delhi
Quality 4/5
Delivery 4/5
I
Ishita Deshmukh
β Verified
23 May 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
T-SECTION, BOLTED, (ANSI)
βΉ 23,996
View β
Damaged Packaging
Box was torn up and items were loose.
π Water and Wastewater Treatment
βοΈ Membrane CIP feeding
π Delhi
Quality 4/5
Delivery 4/5
P
Puneet Sen
β Verified
23 May 2026 β’ 6β12 months β’ π Madurai
β
β
β
β
β
O-RING, (3.475 X .210) TFE/VIT
βΉ 1,446
View β
Broken Links On Site
Several search features did not load properly.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Madurai
Quality 4/5
Delivery 4/5
A
Aarav Shukla
β Verified
23 May 2026 β’ Over 1 year β’ π Rajkot
β
β
β
β
β
Shaft, Pro-Flo,Ptfe
βΉ 1,508
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Chemical Processing
βοΈ Solvent extraction
π Rajkot
Quality 4/5
Delivery 4/5