V
Varun Srivastava
β Verified
20 May 2026 β’ 1β6 months β’ π Kanpur
β
β
β
β
β
AODD PUMP 1 1/2 INCH-SS 316 MOC (B40 05 SA BB TTS 471)
βΉ 135,000
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Pharmaceutical & Cosmetics
βοΈ Shampoo processing
π Kanpur
Quality 4/5
Delivery 4/5
A
Abhishek Singh
β Verified
20 May 2026 β’ 1β6 months β’ π Faridabad
β
β
β
β
β
VALVE BALL - 2"
βΉ 8,018
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Mining and Construction
βοΈ Grout injection
π Faridabad
Quality 4/5
Delivery 4/5
K
Kirubakaran Balan
β Verified
20 May 2026 β’ 1β6 months β’ π Ranipet
β
β
β
β
β
HOUSING BOLT SS 316-TIE ROD
View β
Hardware Glitch
Stopped responding during initial operational tests.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Ranipet
Quality 4/5
Delivery 4/5
V
Vivaan Gupta
β Verified
20 May 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
VALVE PLATE (1 - 1.5") (40-005)
βΉ 4,920
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Food and Beverage
βοΈ Beer bottling feed
π Thane
Quality 4/5
Delivery 4/5
R
Rajendra Mishra
β Verified
20 May 2026 β’ 6β12 months β’ π Chennai
β
β
β
β
β
SUCTION VALVE SEAT - EXB (1H-159)
βΉ 3,864
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Water and Wastewater Treatment
βοΈ Methanol dosing
π Chennai
Quality 4/5
Delivery 4/5
A
Aditya Pandey
β Verified
20 May 2026 β’ Less than 1 month β’ π Vijayawada
β
β
β
β
β
DIPHRAGM SHAFT-EXB (25-081)
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Food and Beverage
βοΈ Baby food purees
π Vijayawada
Quality 4/5
Delivery 4/5
R
Ramesh Nair
β Verified
20 May 2026 β’ 1β6 months β’ π Bengaluru
β
β
β
β
β
WETTED END KIT
βΉ 18,254
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Paint, Ink, and Coatings
βοΈ Binder resin transfer
π Bengaluru
Quality 4/5
Delivery 4/5
S
Siddharth Pillai
β Verified
20 May 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
AIR SIDE KIT - 1" (ASK 2505 470)
βΉ 6,590
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Paint, Ink, and Coatings
βοΈ Can coating circulation
π Pune
Quality 4/5
Delivery 4/5
D
Diya Pillai
β Verified
20 May 2026 β’ Less than 1 month β’ π Bhopal
β
β
β
β
β
VALVE SEAT 2" (50-275)
βΉ 2,185
View β
Overpriced Service
The cost is far too premium compared to alternatives.
π Water and Wastewater Treatment
βοΈ Polymer dosing
π Bhopal
Quality 4/5
Delivery 4/5
S
Sumit Gaikwad
β Verified
20 May 2026 β’ Less than 1 month β’ π Allahabad
β
β
β
β
β
END CAP-EXB (165.127.157)
βΉ 965
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Allahabad
Quality 4/5
Delivery 4/5