R
Ritam Jadav
β Verified
14 May 2026 β’ 1β6 months β’ π Uttar Pradesh
β
β
β
β
β
DIAPHRAGM SANTOPRENE BACKUP - EXB (15-219)
βΉ 4,275
View β
Defective Design
Failed under standard load conditions within days.
π Chemical Processing
βοΈ Corrosive sampling
π Uttar Pradesh
Quality 4/5
Delivery 4/5
P
Parithi Y
β Verified
14 May 2026 β’ 6β12 months β’ π Coimbatore
β
β
β
β
β
SLIDE VALVE
βΉ 2,305
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Paint, Ink, and Coatings
βοΈ UV curable ink
π Coimbatore
Quality 4/5
Delivery 4/5
S
Sujit Solanki
β Verified
14 May 2026 β’ Over 1 year β’ π Ranchi
β
β
β
β
β
VALVE BALL PTFE - 1/4" (06-145)
βΉ 902
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Chemical Processing
βοΈ Acid pickling
π Ranchi
Quality 3/5
Delivery 3/5
R
Ritesh Sen
β Verified
14 May 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
VALVE CAP - LEFT HAND -1" - EXB (1A-030)
βΉ 969
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Delhi
Quality 4/5
Delivery 4/5
R
Ram Tiwari
β Verified
14 May 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
DIAPHARGM EPDM ( 1 50 50 08)
βΉ 47,193
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Chemical Processing
βοΈ Plating bath replenishment
π Hyderabad
Quality 4/5
Delivery 4/5
I
Ishita Malhotra
β Verified
13 May 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
M6M EPDM PHE Gasket
βΉ 594
View β
Unavailable Cert Documents
Support failed to deliver material cert papers for audit.
π HVAC & Home Appliances
βοΈ Server Aisle Low-Emission Seals
π Mumbai
Quality 4/5
Delivery 4/5
S
Sanjay Choudhury
β Verified
09 May 2026 β’ 1β6 months β’ π Surat
β
β
β
β
β
Piston, Outer, (Non-Ptfe)
βΉ 4,113
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Can coating circulation
π Surat
Quality 4/5
Delivery 4/5
R
Ridhima Sen
β Verified
09 May 2026 β’ Less than 1 month β’ π Ahmedabad
β
β
β
β
β
CLAMP BAND, SMALL, NESTED
βΉ 3,256
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Acid mine drainage
π Ahmedabad
Quality 4/5
Delivery 4/5
V
Vikas Kapoor
β Verified
09 May 2026 β’ 1β6 months β’ π Kalyan-Dombivli
β
β
β
β
β
CHAMBER, AIR, PV8
βΉ 5,101
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Food and Beverage
βοΈ Juice concentrate transfer
π Kalyan-Dombivli
Quality 4/5
Delivery 4/5
V
Vihaan Khanna
β Verified
09 May 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
PIPE, 3/8 SCHED 40 X 3.625
View β
Unhelpful Support
Took days to get a generic email reply.
π Food and Beverage
βοΈ Honey dispensing
π Thane
Quality 4/5
Delivery 4/5