N
Nishant Arora
β Verified
08 May 2026 β’ 6β12 months β’ π Madurai
β
β
β
β
β
AIR REPAIR KIT 1.5" - 2"
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Effluent sampling
π Madurai
Quality 4/5
Delivery 4/5
S
Sujit Arora
β Verified
08 May 2026 β’ Less than 1 month β’ π Agra
β
β
β
β
β
Manifold, Discharge
βΉ 2,669
View β
Damaged Packaging
Box was torn up and items were loose.
π Chemical Processing
βοΈ Plating bath replenishment
π Agra
Quality 4/5
Delivery 4/5
S
Shashi Nair
β Verified
08 May 2026 β’ Less than 1 month β’ π Gwalior
β
β
β
β
β
Ball, Valve, Neoprene
βΉ 543
View β
Poor Quality Control
The item felt cheap and fell short.
π Paint, Ink, and Coatings
βοΈ Binder resin transfer
π Gwalior
Quality 4/5
Delivery 4/5
D
Dinesh Arora
β Verified
08 May 2026 β’ Less than 1 month β’ π Rajkot
β
β
β
β
β
Washer, Disc Sprng(.413 X.906)
βΉ 57
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Reagent chemical dosing
π Rajkot
Quality 4/5
Delivery 4/5
V
Vijay Yadav
β Verified
08 May 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
ASSY, PILOT SLEEVE, P1
βΉ 5,151
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Descaling line supply
π Vadodara
Quality 4/5
Delivery 4/5
R
Ramesh Grover
β Verified
08 May 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
ASSY, AIR VALVE, P1/P2, PCM I
βΉ 10,959
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Corrosive sampling
π Pune
Quality 4/5
Delivery 4/5
D
Diya Goel
β Verified
08 May 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
O-RING, (.734 X.139)BUNA
βΉ 6
View β
Confusing Interface
Website was difficult to navigate and use.
π Water and Wastewater Treatment
βοΈ Membrane CIP feeding
π Visakhapatnam
Quality 4/5
Delivery 4/5
S
Sneha Sharma
β Verified
08 May 2026 β’ Over 1 year β’ π Kolkata
β
β
β
β
β
Clamp Band Nut
βΉ 91
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Filling machine supply
π Kolkata
Quality 4/5
Delivery 4/5
S
Siddharth Banerjee
β Verified
08 May 2026 β’ 6β12 months β’ π Indore
β
β
β
β
β
CHAMBER, LIQUID, P200
βΉ 20,633
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Saline formulation transfer
π Indore
Quality 4/5
Delivery 4/5
A
Aditya Goel
β Verified
08 May 2026 β’ 6β12 months β’ π Thane
β
β
β
β
β
O-Ring (1.734 X .139) Ptfe
βΉ 304
View β
Broken Links On Site
Several search features did not load properly.
π Pharmaceutical & Cosmetics
βοΈ Shampoo processing
π Thane
Quality 4/5
Delivery 4/5