R
Rohan Jadav
β Verified
04 May 2026 β’ 1β6 months β’ π Ludhiana
β
β
β
β
β
DIAPHRAGM TEFLON (1 50 50 05)
βΉ 71,153
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Paint, Ink, and Coatings
βοΈ Glue packaging
π Ludhiana
Quality 4/5
Delivery 4/5
S
Shantanu Joshi
β Verified
04 May 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
VALVE CAP - LEFT HAND -1" - EXB (1A-030)
βΉ 969
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Vadodara
Quality 4/5
Delivery 4/5
V
Velmurugan Pandian
β Verified
04 May 2026 β’ 6β12 months β’ π Hosur
β
β
β
β
β
DIAPHRAGM SANTOPRENE BACKUP - EXB (15-219)
βΉ 4,275
View β
Hardware Glitch
Stopped responding during initial operational tests.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Hosur
Quality 4/5
Delivery 4/5
K
Kabir Deshmukh
β Verified
04 May 2026 β’ 1β6 months β’ π Raipur
β
β
β
β
β
VALVE PLATE (06-003)
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Food and Beverage
βοΈ Gelatin batching
π Raipur
Quality 4/5
Delivery 4/5
P
Priya Deshmukh
β Verified
03 May 2026 β’ 6β12 months β’ π Chennai
β
β
β
β
β
O-RING - EXB
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Chennai
Quality 4/5
Delivery 4/5
K
Kavya Chatterjee
β Verified
03 May 2026 β’ 1β6 months β’ π Ahmedabad
β
β
β
β
β
TURB METER SS 1" (G2S10FQ9GMD)
βΉ 98,262
View β
Slow Loading
Product pages forever.
π Food and Beverage
βοΈ Baking Yeast Water Prep
π Ahmedabad
Quality 4/5
Delivery 4/5
A
Anjali Patel
β Verified
03 May 2026 β’ Less than 1 month β’ π Jaipur
β
β
β
β
β
SUBMERSIBLE SEWAGE PUMP WITH 3 HP MOTOR & 3 HP DOL DIGITAL STARTER (CFSW 333)
βΉ 44,471
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Chemical Processing
βοΈ Reactor batching
π Jaipur
Quality 4/5
Delivery 4/5
H
Harish Bajaj
β Verified
03 May 2026 β’ Over 1 year β’ π Bhopal
β
β
β
β
β
AODD PUMP 1 1/2 INCH-SS 316 MOC (B40 05 SA BB TTS 471)
βΉ 135,000
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Tank circulation
π Bhopal
Quality 4/5
Delivery 4/5
V
Vivaan Sen
β Verified
03 May 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
O-RING INLET/ OUTLET FFKM (2 50 70 04)
βΉ 9,317
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Chemical Processing
βοΈ Leachate recovery
π Delhi
Quality 4/5
Delivery 4/5
R
Ranveer Naidu
β Verified
03 May 2026 β’ 6β12 months β’ π Vijayawada
β
β
β
β
β
DIAPHRAGM PTFE BACKUP - 2" (1B-054)
βΉ 7,200
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Chemical Processing
βοΈ Catalyst injection
π Vijayawada
Quality 4/5
Delivery 4/5