N
Nikhil Jadav
β Verified
16 Apr 2026 β’ Less than 1 month β’ π Indore
β
β
β
β
β
MANIFOLD, COMBO, NPT
βΉ 1,475
View β
Damaged Packaging
Box was torn up and items were loose.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Indore
Quality 4/5
Delivery 4/5
V
Vihaan Bose
β Verified
16 Apr 2026 β’ Over 1 year β’ π Nagpur
β
β
β
β
β
Omron 14-pin Relay Socket, PCB / DIN (PYFZ-14-E)
βΉ 150
View β
Confusing Compatibility Matrix
The website chart listed the sensor as compatible with our model, but the terminal pinouts are completely different.
π Power Generation & Electrical Utilities
βοΈ Transmission Lines
π Nagpur
Quality 4/5
Delivery 4/5
A
Aavya Sen
β Verified
16 Apr 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
FRONT PLATE ASSEMBLY-EXB (SA10042)
βΉ 6,922
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Food and Beverage
βοΈ Pet food injection
π Lucknow
Quality 4/5
Delivery 4/5
S
Sunil Banerjee
β Verified
13 Apr 2026 β’ 6β12 months β’ π Lucknow
β
β
β
β
β
Manifold, Inlet, Footed-Bsp
βΉ 59,937
View β
Delayed Delivery
Package arrived much later than promised.
π Paint, Ink, and Coatings
βοΈ Drum tinting supply
π Lucknow
Quality 4/5
Delivery 4/5
S
Shreya Singh
β Verified
13 Apr 2026 β’ 1β6 months β’ π Patna
β
β
β
β
β
O-RING, (3.234 X.139)TFE/VITON- Dampener Part
βΉ 634
View β
Broken Links On Site
Several search features did not load properly.
π Mining and Construction
βοΈ Tailings slurry transfer
π Patna
Quality 4/5
Delivery 4/5
V
Varun Kapoor
β Verified
13 Apr 2026 β’ 1β6 months β’ π Surat
β
β
β
β
β
Chamber, Air, T15, Alum
βΉ 7,565
View β
Damaged Packaging
Box was torn up and items were loose.
π Chemical Processing
βοΈ Fertilizer blending
π Surat
Quality 4/5
Delivery 4/5
K
Karan Sen
β Verified
13 Apr 2026 β’ 1β6 months β’ π Surat
β
β
β
β
β
O-Ring, (3.600 X.210)Teflon
βΉ 717
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Food and Beverage
βοΈ Flavoring oil dosing
π Surat
Quality 4/5
Delivery 4/5
A
Arjun Roy
β Verified
13 Apr 2026 β’ Less than 1 month β’ π Kalyan-Dombivli
β
β
β
β
β
CENTER BLOCK KIT, PX4/PX8
βΉ 24,145
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Water and Wastewater Treatment
βοΈ Stormwater overflow bypass
π Kalyan-Dombivli
Quality 4/5
Delivery 4/5
D
Devendra Khanna
β Verified
13 Apr 2026 β’ 6β12 months β’ π Navi Mumbai
β
β
β
β
β
Shaft, Straight, Ptfe, Ss, T8
βΉ 1,548
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Sump dewatering
π Navi Mumbai
Quality 4/5
Delivery 4/5
P
Priya Srivastava
β Verified
13 Apr 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
MANIFOLD, INLET, ADV ANSI
βΉ 6,220
View β
Poor Quality Control
The item felt cheap and fell short.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Lucknow
Quality 4/5
Delivery 4/5