K
Kaushik Chauhan
β Verified
05 Apr 2026 β’ Over 1 year β’ π Gwalior
β
β
β
β
β
DIAPHRAGM NEOPRENE - 3" (286-098-365)
βΉ 13,680
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Paint, Ink, and Coatings
βοΈ Solvent recovery distillation
π Gwalior
Quality 4/5
Delivery 4/5
G
Gaurav Khanna
β Verified
05 Apr 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
BACK PLATE 2" (50-055)
βΉ 10,230
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Chemical Processing
βοΈ Tanker offloading
π Lucknow
Quality 4/5
Delivery 4/5
P
Pramod Arora
β Verified
05 Apr 2026 β’ Less than 1 month β’ π Hubli-Dharwad
β
β
β
β
β
SILENCER-EXB (40-095)
βΉ 3,708
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Mining and Construction
βοΈ Crushed ore slurry
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
G
Gaurav Das
β Verified
05 Apr 2026 β’ Over 1 year β’ π Kolkata
β
β
β
β
β
VALVE BALL TEFLON - 1" (1A-002)
βΉ 3,514
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Chemical Processing
βοΈ Reagent dispensing
π Kolkata
Quality 4/5
Delivery 4/5
A
Anurag Das
β Verified
05 Apr 2026 β’ Over 1 year β’ π Kolkata
β
β
β
β
β
CENTER HOUSING PE CONDUCTIVE
βΉ 25,774
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Kolkata
Quality 3/5
Delivery 3/5
J
Jayachandran K
β Verified
05 Apr 2026 β’ Less than 1 month β’ π Coimbatore
β
β
β
β
β
BUSH PTFE
βΉ 1,815
View β
Defective Design
Failed under standard load conditions within days.
π Food and Beverage
βοΈ CIP solution circulation
π Coimbatore
Quality 4/5
Delivery 4/5
D
Dhruv Joshi
β Verified
05 Apr 2026 β’ Over 1 year β’ π Kanpur
β
β
β
β
β
VALVE BALL WEIGHTED -2" (1A-092)
βΉ 4,059
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Mining and Construction
βοΈ Explosive slurry loading
π Kanpur
Quality 4/5
Delivery 4/5
P
Pramod Shinde
β Verified
05 Apr 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
OUTER PLATE (10-023)
View β
Frequent Errors
The online portal lags significantly during processing.
π Chemical Processing
βοΈ Catalyst injection
π Lucknow
Quality 4/5
Delivery 4/5
R
Rakesh Patil
β Verified
05 Apr 2026 β’ Over 1 year β’ π Meerut
β
β
β
β
β
VALVE BLOCK STRAP-1/4
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Meerut
Quality 3/5
Delivery 3/5
A
Aryan Dubey
β Verified
05 Apr 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
DIAPHRAGM SHAFT SEAL (15-018)
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Chemical Processing
βοΈ Plating bath replenishment
π Indore
Quality 4/5
Delivery 4/5