P
Piyush Mishra
β Verified
11 Feb 2026 β’ Less than 1 month β’ π Hyderabad
β
β
β
β
β
SCREW, HHC, 3/8-16 X 1 1/4
βΉ 69
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Underground utility clearing
π Hyderabad
Quality 4/5
Delivery 4/5
S
Sameer Solanki
β Verified
11 Feb 2026 β’ 1β6 months β’ π Rajkot
β
β
β
β
β
Manifold, Discharge, Bspt
βΉ 24,481
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Slurry polymer mixing
π Rajkot
Quality 4/5
Delivery 4/5
A
Anil Nair
β Verified
11 Feb 2026 β’ 6β12 months β’ π Rajkot
β
β
β
β
β
NIPPLE, CLOSE, 3/4" NPT
View β
Damaged Packaging
Box was torn up and items were loose.
π Chemical Processing
βοΈ Descaling line supply
π Rajkot
Quality 4/5
Delivery 4/5
U
Ujjwal Kapoor
β Verified
11 Feb 2026 β’ 6β12 months β’ π Navi Mumbai
β
β
β
β
β
Ball, Valve, Teflon, 1.875-In
βΉ 1,516
View β
Delayed Delivery
Package arrived much later than promised.
π Paint, Ink, and Coatings
βοΈ Dye metering
π Navi Mumbai
Quality 4/5
Delivery 4/5
R
Reyansh Choudhury
β Verified
11 Feb 2026 β’ 1β6 months β’ π Jaipur
β
β
β
β
β
Ball, Valve, Buna, Adv
βΉ 429
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Jaipur
Quality 4/5
Delivery 4/5
R
Ridhima Bajaj
β Verified
11 Feb 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
P2 Pro-Flo 1" Clamped Metal Pump
View β
Unhelpful Support
Took days to get a generic email reply.
π Water and Wastewater Treatment
βοΈ Methanol dosing
π Visakhapatnam
Quality 4/5
Delivery 4/5
A
Anil Rao
β Verified
11 Feb 2026 β’ Over 1 year β’ π Patna
β
β
β
β
β
CENTER SECTION, GASKET, H200
βΉ 1,891
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Food and Beverage
βοΈ Honey dispensing
π Patna
Quality 4/5
Delivery 4/5
S
Shreya Deshmukh
β Verified
11 Feb 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
PISTON, OUTER, (COMBO)
βΉ 651
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Mining and Construction
βοΈ Truck wash evacuation
π Lucknow
Quality 4/5
Delivery 4/5
S
Shreya Khanna
β Verified
11 Feb 2026 β’ 6β12 months β’ π Bengaluru
β
β
β
β
β
Manifold, Discharge, Ansi
βΉ 2,788
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Mining and Construction
βοΈ Crushed ore slurry
π Bengaluru
Quality 4/5
Delivery 4/5
K
Karan Sharma
β Verified
11 Feb 2026 β’ 1β6 months β’ π Hyderabad
β
β
β
β
β
Bushing, Reducer
βΉ 375
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Seawater intake priming
π Hyderabad
Quality 4/5
Delivery 4/5