A
Abhishek Ghosh
β Verified
10 Feb 2026 β’ 6β12 months β’ π Kolkata
β
β
β
β
β
SEAT, VALVE, POLY, CHAMP
βΉ 1,113
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Mine shaft dewatering
π Kolkata
Quality 4/5
Delivery 4/5
S
Shreyas Trivedi
β Verified
10 Feb 2026 β’ 1β6 months β’ π Kolkata
β
β
β
β
β
Diaphragm Primary Buna
βΉ 2,234
View β
Confusing Interface
Website was difficult to navigate and use.
π Chemical Processing
βοΈ Polymer dosing
π Kolkata
Quality 4/5
Delivery 4/5
S
Sunil Naidu
β Verified
10 Feb 2026 β’ 6β12 months β’ π Nagpur
β
β
β
β
β
SEAT, VALVE, PVDF, CHAMP
βΉ 4,976
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Nail polish filling
π Nagpur
Quality 4/5
Delivery 4/5
P
Pooja Bansal
β Verified
10 Feb 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
KIT, P1, POLY, COMBO
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Hot melt pre-heating
π Delhi
Quality 4/5
Delivery 4/5
P
Prasanna Devan
β Verified
10 Feb 2026 β’ 1β6 months β’ π Tirupur
β
β
β
β
β
MANIFOLD, INLET, P200 ANSI
βΉ 20,373
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Tirupur
Quality 4/5
Delivery 4/5
A
Arun Agarwal
β Verified
10 Feb 2026 β’ Less than 1 month β’ π Bhopal
β
β
β
β
β
Muffler, 1/2"
βΉ 1,615
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Hydraulic oil scavenging
π Bhopal
Quality 4/5
Delivery 4/5
A
Anil Saxena
β Verified
10 Feb 2026 β’ 1β6 months β’ π Kolkata
β
β
β
β
β
O-Ring, (2.359x.139), Neoprene -
βΉ 81
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Latex base transfer
π Kolkata
Quality 4/5
Delivery 4/5
R
Rohan Srivastava
β Verified
10 Feb 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
SEAT, VALVE, STAINLESS STEEL
βΉ 868
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Solvent extraction
π Lucknow
Quality 4/5
Delivery 4/5
S
Sneha Patel
β Verified
10 Feb 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
MANIFOLD, DISCH ADV NPT
βΉ 5,335
View β
Unhelpful Support
Took days to get a generic email reply.
π Water and Wastewater Treatment
βοΈ Sludge dewatering
π Vadodara
Quality 4/5
Delivery 4/5
S
Sai Singh
β Verified
10 Feb 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
O-ring, (0.674 x 0.103), Buna
βΉ 16
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Tunneling drainage
π Thane
Quality 4/5
Delivery 4/5