P
Praveen Menon
β Verified
20 Jan 2026 β’ Over 1 year β’ π Jodhpur
β
β
β
β
β
DIAPHRAGM TEFLON - 1.5" (40-020)
βΉ 15,846
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Chemical Processing
βοΈ Solvent extraction
π Jodhpur
Quality 4/5
Delivery 4/5
S
Shravan Reddy
β Verified
20 Jan 2026 β’ Less than 1 month β’ π Bengaluru
β
β
β
β
β
WETTED END KIT
βΉ 15,513
View β
Frequent Errors
The online portal lags significantly during processing.
π Water and Wastewater Treatment
βοΈ Trench drainage
π Bengaluru
Quality 4/5
Delivery 4/5
V
Vivaan Bajaj
β Verified
20 Jan 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
VALVE SEAT (50-276)
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Mining and Construction
βοΈ Reagent chemical dosing
π Bhopal
Quality 4/5
Delivery 4/5
P
Pranav Mehta
β Verified
20 Jan 2026 β’ 6β12 months β’ π Bengaluru
β
β
β
β
β
AIR SIDE KIT HT - 1"
βΉ 6,783
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Mining and Construction
βοΈ Reagent chemical dosing
π Bengaluru
Quality 4/5
Delivery 4/5
K
Kamal Joshi
β Verified
20 Jan 2026 β’ Over 1 year β’ π Kolkata
β
β
β
β
β
SILENCER - EXB (06-034)
βΉ 1,954
View β
Defective Design
Failed under standard load conditions within days.
π Pharmaceutical & Cosmetics
βοΈ Essential oil extraction
π Kolkata
Quality 4/5
Delivery 4/5
R
Rohan Singh
β Verified
20 Jan 2026 β’ Less than 1 month β’ π Ghaziabad
β
β
β
β
β
GASKET CENTER SECTION (06-170)
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Paint, Ink, and Coatings
βοΈ Filling machine supply
π Ghaziabad
Quality 3/5
Delivery 3/5
V
Vipul Jadav
β Verified
20 Jan 2026 β’ Over 1 year β’ π Kota
β
β
β
β
β
DIAPHRAGM TEFLON (1 25 5005)
βΉ 27,832
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Pharmaceutical & Cosmetics
βοΈ Tablet coating supply
π Kota
Quality 4/5
Delivery 4/5
D
Darshan Grover
β Verified
20 Jan 2026 β’ Over 1 year β’ π Srinagar
β
β
β
β
β
V25-024PX VANE PUMP (170001-04)
βΉ 125,000
View β
Frequent Errors
The online portal lags significantly during processing.
π Water and Wastewater Treatment
βοΈ Swimming Pool Filtration Circuits
π Srinagar
Quality 4/5
Delivery 4/5
R
Rakesh Chatterjee
β Verified
20 Jan 2026 β’ 6β12 months β’ π Uttar Pradesh
β
β
β
β
β
O-RING FOR C.HOUSING SEAL NBR
βΉ 363
View β
Delayed Feedback
Took several business days to receive a generic response.
π Paint, Ink, and Coatings
βοΈ Let-down tank transfer
π Uttar Pradesh
Quality 4/5
Delivery 4/5
S
Sandeep Gaikwad
β Verified
20 Jan 2026 β’ Less than 1 month β’ π Rajkot
β
β
β
β
β
VALVE SEAT-ST/STEEL - EXB
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Pharmaceutical & Cosmetics
βοΈ Tablet coating supply
π Rajkot
Quality 4/5
Delivery 4/5