V
Vijay Z
β Verified
04 Mar 2026 β’ Over 1 year β’ π Tuticorin
β
β
β
β
β
MANIFOLD, DISCHARGE, BSPT
βΉ 3,126
View β
Unhelpful Support
Took days to get a generic email reply.
π Chemical Processing
βοΈ Scrubber fluid circulation
π Tuticorin
Quality 4/5
Delivery 4/5
A
Ashwin Mehta
β Verified
04 Mar 2026 β’ 6β12 months β’ π Raipur
β
β
β
β
β
SCREW, HHC, 1/2-13 X 1 1/2
βΉ 62
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Catalyst injection
π Raipur
Quality 4/5
Delivery 4/5
A
Anand Tiwari
β Verified
04 Mar 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
Shaft, Pro-Flo, Ptfe, Ss
βΉ 948
View β
Poor Quality Control
The item felt cheap and fell short.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Thane
Quality 4/5
Delivery 4/5
S
Subhash Grover
β Verified
04 Mar 2026 β’ 1β6 months β’ π Rajkot
β
β
β
β
β
Diaphragm Primary Polyurethane
βΉ 3,331
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Paint, Ink, and Coatings
βοΈ Filter press recirculation
π Rajkot
Quality 4/5
Delivery 4/5
J
Jatin Mukherjee
β Verified
04 Mar 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
MUFFLER PLATE, PV4
βΉ 1,568
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Sludge dewatering
π Chennai
Quality 4/5
Delivery 4/5
N
Nishant Pandey
β Verified
04 Mar 2026 β’ 1β6 months β’ π Madurai
β
β
β
β
β
BALL, VALVE, VITON,STALLION
βΉ 7,004
View β
Damaged Packaging
Box was torn up and items were loose.
π Mining and Construction
βοΈ Drilling mud recirculation
π Madurai
Quality 4/5
Delivery 4/5
B
Bhuvnesh Mishra
β Verified
04 Mar 2026 β’ 1β6 months β’ π Indore
β
β
β
β
β
CLAMP BAND, LARGE, NESTED
βΉ 2,843
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Coagulant feeding
π Indore
Quality 4/5
Delivery 4/5
A
Anand Pillai
β Verified
04 Mar 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
BALL, VALVE, VITON
βΉ 2,852
View β
Confusing Interface
Website was difficult to navigate and use.
π Mining and Construction
βοΈ Sand washing runoff
π Nagpur
Quality 4/5
Delivery 4/5
H
Harish Naik
β Verified
04 Mar 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
O-Ring, (1.859 X.139)Tfe/Viton
βΉ 844
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Water and Wastewater Treatment
βοΈ Filter backwash evacuation
π Lucknow
Quality 4/5
Delivery 4/5
V
Vihaan Singh
β Verified
04 Mar 2026 β’ Over 1 year β’ π Mumbai
β
β
β
β
β
MANIFOLD, DISCHARGE, LONG NECK
βΉ 22,913
View β
Delayed Delivery
Package arrived much later than promised.
π Paint, Ink, and Coatings
βοΈ Let-down tank transfer
π Mumbai
Quality 4/5
Delivery 4/5