D
Deepak S
β Verified
12 Feb 2026 β’ 6β12 months β’ π Chennai
β
β
β
β
β
KIT, ROTOR & SUPPORT 1/2" (125500-1)
βΉ 8,818
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Industrial Automation & Manufacturing
βοΈ Fleet Refueling Depots
π Chennai
Quality 4/5
Delivery 4/5
P
Prakash Verma
β Verified
12 Feb 2026 β’ Less than 1 month β’ π Madurai
β
β
β
β
β
AIR VALVE ASSEMBLY (031.140.000)
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Water and Wastewater Treatment
βοΈ Dechlorination agent feed
π Madurai
Quality 4/5
Delivery 4/5
V
Vikas Kumar
β Verified
12 Feb 2026 β’ 6β12 months β’ π Uttar Pradesh
β
β
β
β
β
MUFFLER PE POROUS (1 40 99 35)
βΉ 14,521
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Chemical Processing
βοΈ Fertilizer blending
π Uttar Pradesh
Quality 4/5
Delivery 4/5
G
Gaurav Kapoor
β Verified
12 Feb 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
BUSH - DIAPHRAGM SHAFT - EXB (1B-020)
View β
Defective Design
Failed under standard load conditions within days.
π Chemical Processing
βοΈ Reactor batching
π Lucknow
Quality 4/5
Delivery 4/5
J
Jignesh Dutta
β Verified
12 Feb 2026 β’ Less than 1 month β’ π Hyderabad
β
β
β
β
β
DIAPHARGM TEFLON 1/4" (06-141)
βΉ 3,505
View β
Delayed Feedback
Took several business days to receive a generic response.
π Pharmaceutical & Cosmetics
βοΈ Cough syrup filling
π Hyderabad
Quality 3/5
Delivery 3/5
R
Ram Ghosh
β Verified
12 Feb 2026 β’ 1β6 months β’ π Agra
β
β
β
β
β
SHAFT BUSH (15-182)
View β
Frequent Errors
The online portal lags significantly during processing.
π Pharmaceutical & Cosmetics
βοΈ Essential oil extraction
π Agra
Quality 4/5
Delivery 4/5
V
Vinod Arora
β Verified
12 Feb 2026 β’ 1β6 months β’ π Jaipur
β
β
β
β
β
GASKET - EXB (1A-026)
View β
Inconsistent Output
Performance varies wildly and lacks precision controls.
π Paint, Ink, and Coatings
βοΈ Filter press recirculation
π Jaipur
Quality 4/5
Delivery 4/5
R
Ravi Bajpai
β Verified
12 Feb 2026 β’ 1β6 months β’ π Aurangabad
β
β
β
β
β
SHOCK ABSORBER (1 15 69 06)
βΉ 968
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Food and Beverage
βοΈ Syrup tank unloading
π Aurangabad
Quality 4/5
Delivery 4/5
A
Aditya Kumar
β Verified
11 Feb 2026 β’ 1β6 months β’ π Indore
β
β
β
β
β
SURGE END, W/GLAND, COMBO
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Tank circulation
π Indore
Quality 4/5
Delivery 4/5
A
Arun Chatterjee
β Verified
11 Feb 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
ELBOW, DISCHARGE, BOLTED
βΉ 13,862
View β
Unhelpful Support
Took days to get a generic email reply.
π Paint, Ink, and Coatings
βοΈ Drum tinting supply
π Hyderabad
Quality 4/5
Delivery 4/5