R
Rajesh Joshi
β Verified
07 Feb 2026 β’ Over 1 year β’ π Nagpur
β
β
β
β
β
CHAMBER, LIQUID, M2R
βΉ 2,658
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Pharmaceutical & Cosmetics
βοΈ Pure water loop
π Nagpur
Quality 4/5
Delivery 4/5
I
Ishita Trivedi
β Verified
07 Feb 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
MUFFLER, 3/8""
βΉ 1,076
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Food and Beverage
βοΈ CIP solution circulation
π Thane
Quality 4/5
Delivery 4/5
D
Deepak Goel
β Verified
07 Feb 2026 β’ 6β12 months β’ π Thane
β
β
β
β
β
SCREW, HHC, 10-24 X 1 1/2
βΉ 152
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Hydraulic oil scavenging
π Thane
Quality 4/5
Delivery 4/5
S
Shreya Bansal
β Verified
07 Feb 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
SS 304 Flange 1.5-inch
βΉ 466
View β
Damaged Packaging
Box was torn up and items were loose.
π Chemical Processing
βοΈ Connects flexible piping used to transfer chemicals to railcars or trucks.
π Nagpur
Quality 4/5
Delivery 4/5
I
Ishita Choudhury
β Verified
07 Feb 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
Pro-Flo Air Valve Assembly
βΉ 6,517
View β
Delayed Delivery
Package arrived much later than promised.
π Chemical Processing
βοΈ Tanker offloading
π Mumbai
Quality 4/5
Delivery 4/5
A
Aditya Kumar
β Verified
07 Feb 2026 β’ Over 1 year β’ π Pimpri-Chinchwad
β
β
β
β
β
Air Valve Bolt
βΉ 41
View β
Broken Links On Site
Several search features did not load properly.
π Paint, Ink, and Coatings
βοΈ Spray booth extraction
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
V
Vihaan Nair
β Verified
03 Feb 2026 β’ Less than 1 month β’ π Surat
β
β
β
β
β
O-RING
View β
Frequent Errors
The online portal lags significantly during processing.
π Food and Beverage
βοΈ Flavoring oil dosing
π Surat
Quality 4/5
Delivery 4/5
N
Nikhil Choudhury
β Verified
03 Feb 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
AODD PUMP 2 INCH-SS 316 MOC (B50 05 SA BB TTS 472)
βΉ 195,000
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Food and Beverage
βοΈ Flavoring oil dosing
π Vadodara
Quality 4/5
Delivery 4/5
A
Arjun Deshmukh
β Verified
03 Feb 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
SET 1 SERVICE KIT (DM 25-PTT)
βΉ 80,954
View β
Frequent Errors
The online portal lags significantly during processing.
π Chemical Processing
βοΈ Tank circulation
π Nagpur
Quality 4/5
Delivery 4/5
D
Deepak Verma
β Verified
03 Feb 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
VALVE BLOCK PLUG 2" (50-341)
βΉ 2,932
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Mumbai
Quality 4/5
Delivery 4/5