R
Rajadurai Shankar
β Verified
22 Jan 2026 β’ 6β12 months β’ π Tuticorin
β
β
β
β
β
VALVE CAP RIGHT HAND -1" - EXB (1A-031)
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Pharmaceutical & Cosmetics
βοΈ Face wash scrub
π Tuticorin
Quality 4/5
Delivery 4/5
A
Aniket Das
β Verified
22 Jan 2026 β’ Over 1 year β’ π Surat
β
β
β
β
β
VALVE BALL DISCHARGE -1/4" (06-151)
View β
Incomplete Package
Several vital components were missing from the order box.
π Paint, Ink, and Coatings
βοΈ Sealant dispensing
π Surat
Quality 3/5
Delivery 3/5
Y
Yuvraj Bajpai
β Verified
22 Jan 2026 β’ Over 1 year β’ π Madurai
β
β
β
β
β
MUFFLER PE POROUS (1 15 99 35)
βΉ 9,922
View β
Missing Details
Critical item specifications are omitted from the page.
π Water and Wastewater Treatment
βοΈ Methanol dosing
π Madurai
Quality 4/5
Delivery 4/5
D
Dev Das
β Verified
22 Jan 2026 β’ Less than 1 month β’ π Rajkot
β
β
β
β
β
VALVE BALL WHITE
View β
Poor Tracking Info
Logistics status updates remained completely unavailable throughout.
π Food and Beverage
βοΈ Tomato paste unloading
π Rajkot
Quality 4/5
Delivery 4/5
A
Aniket Ghosh
β Verified
22 Jan 2026 β’ 1β6 months β’ π Solapur
β
β
β
β
β
VALVE SEAR SS EXI (1B-051)
βΉ 3,324
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Water and Wastewater Treatment
βοΈ Seawater intake priming
π Solapur
Quality 4/5
Delivery 4/5
A
Aakash Garg
β Verified
20 Jan 2026 β’ 1β6 months β’ π Kanpur
β
β
β
β
β
O-RING
βΉ 931
View β
Defective Design
Failed under standard load conditions within days.
π Chemical Processing
βοΈ Neutralization feeding
π Kanpur
Quality 4/5
Delivery 4/5
N
Neha Tiwar
β Verified
20 Jan 2026 β’ Less than 1 month β’ π Patna
β
β
β
β
β
M6 NBR PHE Gasket
βΉ 494
View β
Unavailable Cert Documents
Support failed to deliver material cert papers for audit.
π Chemical Processing
βοΈ Chloride-Resistant Seals
π Patna
Quality 4/5
Delivery 4/5
N
Nikhil Singh
β Verified
20 Jan 2026 β’ Over 1 year β’ π Surat
β
β
β
β
β
AIR END KIT (B476.227.000)
βΉ 42,180
View β
Frequent Errors
The online portal lags significantly during processing.
π Pharmaceutical & Cosmetics
βοΈ Alcohol solvent batching
π Surat
Quality 4/5
Delivery 4/5
V
Varun Mehta
β Verified
20 Jan 2026 β’ Over 1 year β’ π Mumbai
β
β
β
β
β
SUBMERSIBLE SEWAGE PUMP WITH 5 HP MOTOR & 5 HP DOL DIGITAL STARTER (CFSW 534)
βΉ 70,973
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Mining and Construction
βοΈ Sand washing runoff
π Mumbai
Quality 4/5
Delivery 4/5
V
Vivaan Bajaj
β Verified
20 Jan 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
VALVE SEAT (50-276)
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Mining and Construction
βοΈ Reagent chemical dosing
π Bhopal
Quality 4/5
Delivery 4/5