S
Sunil Chatterjee
β Verified
18 Jan 2026 β’ 6β12 months β’ π Patna
β
β
β
β
β
WASHER, FLAT(.392 X.875 X.062)
βΉ 60
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Slurry wall circulation
π Patna
Quality 4/5
Delivery 4/5
R
Rajesh Garg
β Verified
18 Jan 2026 β’ 1β6 months β’ π Kolkata
β
β
β
β
β
Piston, Inner, (Ptfe), T15
βΉ 5,159
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Lipstick wax transfer
π Kolkata
Quality 4/5
Delivery 4/5
H
Himanshu Kumar
β Verified
18 Jan 2026 β’ 1β6 months β’ π Pimpri-Chinchwad
β
β
β
β
β
Connector, Muffler (3/4 X 45)
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Pharmaceutical & Cosmetics
βοΈ Pure water loop
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
V
Vinod Banerjee
β Verified
18 Jan 2026 β’ 6β12 months β’ π Kalyan-Dombivli
β
β
β
β
β
Piston, Outer, (Non-Ptfe)
βΉ 1,828
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Water and Wastewater Treatment
βοΈ Sludge dewatering
π Kalyan-Dombivli
Quality 4/5
Delivery 4/5
P
Pooja Tiwar
β Verified
18 Jan 2026 β’ Over 1 year β’ π Nagpur
β
β
β
β
β
CAGE, BALL
βΉ 1,779
View β
Damaged Packaging
Box was torn up and items were loose.
π Food and Beverage
βοΈ Yeast pitching
π Nagpur
Quality 4/5
Delivery 4/5
S
Shaurya Mukherjee
β Verified
18 Jan 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
MUFFLER PLATE, PS4-15
βΉ 2,571
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Tailings slurry transfer
π Visakhapatnam
Quality 4/5
Delivery 4/5
P
Ponnumani W
β Verified
18 Jan 2026 β’ Less than 1 month β’ π Tirupur
β
β
β
β
β
SCREW, HHC, 1/2-13 X 2
βΉ 162
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Water and Wastewater Treatment
βοΈ Filter backwash evacuation
π Tirupur
Quality 4/5
Delivery 4/5
P
Pankaj Yadav
β Verified
18 Jan 2026 β’ Less than 1 month β’ π Ahmedabad
β
β
β
β
β
GASKET, T-SECT, 1 1/2 EHEDG,TF
βΉ 200
View β
Damaged Packaging
Box was torn up and items were loose.
π Pharmaceutical & Cosmetics
βοΈ Gel-cap gelatin feed
π Ahmedabad
Quality 4/5
Delivery 4/5
R
Rajat Joshi
β Verified
18 Jan 2026 β’ 6β12 months β’ π Lucknow
β
β
β
β
β
BALL, VALVE, FDA WIL-FLEX
βΉ 1,307
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Acid mine drainage
π Lucknow
Quality 4/5
Delivery 4/5
R
Raghav Iyer
β Verified
18 Jan 2026 β’ Over 1 year β’ π Allahabad
β
β
β
β
β
SHAFT,P400 PLAST,PTFE
βΉ 1,107
View β
Broken Links On Site
Several search features did not load properly.
π Chemical Processing
βοΈ Catalyst injection
π Allahabad
Quality 4/5
Delivery 4/5