N
Naveen P
β Verified
05 Jul 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
PLUG UPPER SEALING
βΉ 6,050
View β
Durable Material
Excellent material choice makes this highly robust.
π Mining and Construction
βοΈ Roadway runoff dewatering
π Chennai
Quality 5/5
Delivery 5/5
R
Rajendra Nair
β Verified
05 Jul 2026 β’ Over 1 year β’ π Hyderabad
β
β
β
β
β
VALVE BALL SS - 1" (1H-087)
βΉ 1,282
View β
Exceptional Quality
The overall build quality exceeded our high expectations.
π Paint, Ink, and Coatings
βοΈ Solvent recovery distillation
π Hyderabad
Quality 5/5
Delivery 5/5
V
Varun Kapoor
β Verified
05 Jul 2026 β’ 6β12 months β’ π Hyderabad
β
β
β
β
β
DIAPHEAGM SHAFT SEAL (25-072)
βΉ 1,895
View β
Expert Assistance
The technical team provided immediate, professional resolution.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Hyderabad
Quality 5/5
Delivery 5/5
A
Amrit Malhotra
β Verified
05 Jul 2026 β’ 6β12 months β’ π Aurangabad
β
β
β
β
β
KIT, ROTOR & SUPPORT 2" (125500-5)
βΉ 10,873
View β
Superb Build
Solid construction handles demanding daily workloads.
π Industrial Automation & Manufacturing
βοΈ Glass Furnace Auxiliary Oil Blending
π Aurangabad
Quality 5/5
Delivery 5/5
G
Govind Malhotra
β Verified
05 Jul 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
VALVE SEAR SS EXI (1B-051)
βΉ 3,324
View β
Prompt Feedback
Received helpful, comprehensive answers within minutes.
π Mining and Construction
βοΈ Fly ash slurry
π Indore
Quality 5/5
Delivery 5/5
S
Sachin Shah
β Verified
05 Jul 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
VALVE CAP RIGHT HAND -1" - EXB (1A-031)
View β
Cost-Effective Pick
Delivers premium functionality at a competitive rate.
π Pharmaceutical & Cosmetics
βοΈ Ointment hopper feeding
π Chennai
Quality 5/5
Delivery 5/5
D
Dilip Banerjee
β Verified
05 Jul 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
DIAPHRAGM BACKUP - 1/4" (06-147)
βΉ 4,436
View β
Highly Economical
Affordable rates cut down our overall project overhead.
π Mining and Construction
βοΈ Reagent chemical dosing
π Lucknow
Quality 4/5
Delivery 4/5
V
Varadhan U
β Verified
05 Jul 2026 β’ 1β6 months β’ π Tuticorin
β
β
β
β
β
VALVE CARRIER - ANODISED-1/4" (06-005)
βΉ 4,615
View β
Damage Free Logistics
Handled carefully with no signs of transit impact.
π Water and Wastewater Treatment
βοΈ Trench drainage
π Tuticorin
Quality 4/5
Delivery 4/5
K
Krishna Shinde
β Verified
05 Jul 2026 β’ Over 1 year β’ π Ghaziabad
β
β
β
β
β
MUFFLER PE POROUS (1 15 99 35)
βΉ 9,922
View β
Exceptional Quality
The overall build quality exceeded our high expectations.
π Mining and Construction
βοΈ Reagent chemical dosing
π Ghaziabad
Quality 4/5
Delivery 4/5
R
Rupesh Tiwari
β Verified
05 Jul 2026 β’ 6β12 months β’ π Ghaziabad
β
β
β
β
β
SILENCER-EXB (15-258)
βΉ 4,350
View β
Prompt Logistics
The shipment reached our location rapidly and intact.
π Pharmaceutical & Cosmetics
βοΈ Hair dye compounding
π Ghaziabad
Quality 5/5
Delivery 5/5