S
Sankaranarayanan Z
β Verified
30 Jul 2026 β’ 1β6 months β’ π Hosur
β
β
β
β
β
DIAPHRAGM SHAFT - (25-060)
βΉ 15,390
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Mining and Construction
βοΈ Mine shaft dewatering
π Hosur
Quality 4/5
Delivery 4/5
S
Sunil Bajpai
β Verified
30 Jul 2026 β’ Over 1 year β’ π Varanasi
β
β
β
β
β
NUT WITH WASHER
βΉ 605
View β
Poor Tracking Info
Logistics status updates remained completely unavailable throughout.
π Food and Beverage
βοΈ Baby food purees
π Varanasi
Quality 4/5
Delivery 4/5
K
Kaushik Solanki
β Verified
30 Jul 2026 β’ 1β6 months β’ π Raipur
β
β
β
β
β
DIAPHARGM COMPOSITE 1/2" (1H-026)
βΉ 1
View β
Frequent Errors
The online portal lags significantly during processing.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Raipur
Quality 4/5
Delivery 4/5
A
Aarav Kapoor
β Verified
30 Jul 2026 β’ Less than 1 month β’ π Pimpri-Chinchwad
β
β
β
β
β
SLIDE VALVE - EXB (50-251)
βΉ 6,465
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Pharmaceutical & Cosmetics
βοΈ Hair dye compounding
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
P
Prem Verma
β Verified
30 Jul 2026 β’ 6β12 months β’ π Uttar Pradesh
β
β
β
β
β
DIAPHRAGM SANTOPRENE - 1.5" (40-223)
βΉ 7,151
View β
No Bulk Incentive
Wholesale pricing structures offer negligible budget savings.
π Mining and Construction
βοΈ Explosive emulsion transfer
π Uttar Pradesh
Quality 4/5
Delivery 4/5
V
Vinod Banerjee
β Verified
30 Jul 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
MUFFLER PE POROUS (1 40 99 35)
βΉ 14,521
View β
Defective Design
Failed under standard load conditions within days.
π Paint, Ink, and Coatings
βοΈ Drum tinting supply
π Lucknow
Quality 4/5
Delivery 4/5
S
Shashi Dubey
β Verified
30 Jul 2026 β’ Less than 1 month β’ π Hubli-Dharwad
β
β
β
β
β
GASKET - EXB (1A-026)
View β
Missing Details
Critical item specifications are omitted from the page.
π Mining and Construction
βοΈ Fly ash slurry
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
G
Govind Iyengar
β Verified
30 Jul 2026 β’ 1β6 months β’ π Hubli-Dharwad
β
β
β
β
β
SEAL PORT - EXB
View β
Incomplete Package
Several vital components were missing from the order box.
π Pharmaceutical & Cosmetics
βοΈ Lipstick wax transfer
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
T
Tushar Bajpai
β Verified
30 Jul 2026 β’ Less than 1 month β’ π Srinagar
β
β
β
β
β
GASKET CENTRE SECTION - EXB (15-199)
βΉ 478
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Chemical Processing
βοΈ Descaling line supply
π Srinagar
Quality 4/5
Delivery 4/5
S
Sumit Gaikwad
β Verified
30 Jul 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
VALVE SEAL SUCTION 1/4"
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Chemical Processing
βοΈ Corrosive sampling
π Visakhapatnam
Quality 3/5
Delivery 3/5