A
Aarav Bajaj
β Verified
15 Jul 2026 β’ Less than 1 month β’ π Pimpri-Chinchwad
β
β
β
β
β
O-Ring, (2.72 X.250)Neoprene
βΉ 111
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Paint, Ink, and Coatings
βοΈ Enamel paint transfer
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
N
Nikhil Das
β Verified
15 Jul 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
Pilot Spool Retaining Ring
βΉ 99
View β
Defective Out of Box
Item failed to work on the first try.
π Pharmaceutical & Cosmetics
βοΈ Shampoo processing
π Thane
Quality 4/5
Delivery 4/5
A
Aakash Shah
β Verified
11 Jul 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
O-RING TEFLON
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Chemical Processing
βοΈ Leachate recovery
π Lucknow
Quality 4/5
Delivery 4/5
P
Pooja Jadav
β Verified
11 Jul 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
O-RING - EXB
βΉ 1
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Pharmaceutical & Cosmetics
βοΈ Chromatography column feeding
π Lucknow
Quality 4/5
Delivery 4/5
J
Jatin Mehta
β Verified
11 Jul 2026 β’ 1β6 months β’ π Surat
β
β
β
β
β
O-RING EPDM-EXB
View β
Inflated Rates
Standard item cost feels artificially high for businesses.
π Paint, Ink, and Coatings
βοΈ Ink press recirculation
π Surat
Quality 4/5
Delivery 4/5
A
Amit Malhotra
β Verified
11 Jul 2026 β’ Less than 1 month β’ π Ahmedabad
β
β
β
β
β
AIR FILTER REGULATOR WITH PRESSURE GAUGE - AFT PORT SIZE 3/4"
βΉ 2,063
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Pharmaceutical & Cosmetics
βοΈ Fermentation broth harvesting
π Ahmedabad
Quality 4/5
Delivery 4/5
I
Ishita Naik
β Verified
11 Jul 2026 β’ Less than 1 month β’ π Hyderabad
β
β
β
β
β
VALVE SEAT EPDM (50-046)
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Water and Wastewater Treatment
βοΈ Alum dosing
π Hyderabad
Quality 4/5
Delivery 4/5
S
Surendra Roy
β Verified
11 Jul 2026 β’ 6β12 months β’ π Bengaluru
β
β
β
β
β
PLATE SEAL DISTRIBUTOR (40-076)
View β
Delayed Feedback
Took several business days to receive a generic response.
π Paint, Ink, and Coatings
βοΈ Solvent recovery distillation
π Bengaluru
Quality 4/5
Delivery 4/5
D
Dinesh Patel
β Verified
11 Jul 2026 β’ Over 1 year β’ π Pune
β
β
β
β
β
LIP-SEAL-BLUE (25-250)
βΉ 807
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Water and Wastewater Treatment
βοΈ Slurry polymer mixing
π Pune
Quality 4/5
Delivery 4/5
A
Adhavan Chamy
β Verified
11 Jul 2026 β’ 1β6 months β’ π Ranipet
β
β
β
β
β
DISCHARGE MANIFOLD - EXB
βΉ 6,084
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Food and Beverage
βοΈ Gelatin batching
π Ranipet
Quality 4/5
Delivery 4/5