S
Sasikumar F
β Verified
28 Jun 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
OUTER COVER
βΉ 38,665
View β
Inconsistent Output
Performance varies wildly and lacks precision controls.
π Pharmaceutical & Cosmetics
βοΈ Nail polish filling
π Chennai
Quality 4/5
Delivery 4/5
S
Sumit Gaikwad
β Verified
28 Jun 2026 β’ Over 1 year β’ π Kanpur
β
β
β
β
β
CYLINDER VALVE PTFE (2 25 56 23)
βΉ 3,267
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Paint, Ink, and Coatings
βοΈ Thinner dosing
π Kanpur
Quality 4/5
Delivery 4/5
P
Pranav Rathod
β Verified
28 Jun 2026 β’ 6β12 months β’ π Vijayawada
β
β
β
β
β
DISCHARGE VALVE SEAT - EXB
βΉ 5,423
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Mining and Construction
βοΈ Underground utility clearing
π Vijayawada
Quality 4/5
Delivery 4/5
V
Vijay Agarwal
β Verified
28 Jun 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
SLEEVE-EXB (755.051.000)
βΉ 3,229
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Water and Wastewater Treatment
βοΈ Seawater intake priming
π Delhi
Quality 4/5
Delivery 4/5
Y
Yash Verma
β Verified
28 Jun 2026 β’ Over 1 year β’ π Ludhiana
β
β
β
β
β
BUSH DIAPHRAGM SHAFT-1" - EXB (1A-011)
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Water and Wastewater Treatment
βοΈ Membrane CIP feeding
π Ludhiana
Quality 4/5
Delivery 4/5
N
Naman Shinde
β Verified
28 Jun 2026 β’ Less than 1 month β’ π Hubli-Dharwad
β
β
β
β
β
VALVE BALL (1 40 60 08)
βΉ 2,662
View β
Incomplete Package
Several vital components were missing from the order box.
π Chemical Processing
βοΈ IBC transferring
π Hubli-Dharwad
Quality 4/5
Delivery 4/5
A
Ansh Pillai
β Verified
28 Jun 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
FRONT PLATE-PVDF (15-062)
View β
Defective Design
Failed under standard load conditions within days.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Pune
Quality 4/5
Delivery 4/5
A
Abhishek Jadav
β Verified
28 Jun 2026 β’ Less than 1 month β’ π Solapur
β
β
β
β
β
SEAL (10-073)
βΉ 1,111
View β
Delayed Feedback
Took several business days to receive a generic response.
π Food and Beverage
βοΈ Alcoholic spirits transfer
π Solapur
Quality 4/5
Delivery 4/5
B
Baldev Sen
β Verified
28 Jun 2026 β’ 1β6 months β’ π Ranchi
β
β
β
β
β
AIR VALVE (1 15 020 32)
βΉ 31,583
View β
Low Durability
Shows early signs of structural wear far too quickly.
π Pharmaceutical & Cosmetics
βοΈ Lipstick wax transfer
π Ranchi
Quality 3/5
Delivery 3/5
S
Sachin Shah
β Verified
28 Jun 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
VALVE BALL SUCTION - 1/4" (06-109)
βΉ 1,200
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Mining and Construction
βοΈ Crushed ore slurry
π Vadodara
Quality 3/5
Delivery 3/5