R
Reyansh Kulkarni
β Verified
23 Jun 2026 β’ 6β12 months β’ π Delhi
β
β
β
β
β
CLAMP BAND, LARGE, NESTED
βΉ 7,113
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Delhi
Quality 4/5
Delivery 4/5
K
Karan Garg
β Verified
23 Jun 2026 β’ 6β12 months β’ π Nagpur
β
β
β
β
β
Stud, 1/2-20 X 2 1/8
βΉ 564
View β
Confusing Interface
Website was difficult to navigate and use.
π Paint, Ink, and Coatings
βοΈ Bulk solvent transfer
π Nagpur
Quality 4/5
Delivery 4/5
J
Jitendra Jadav
β Verified
23 Jun 2026 β’ 6β12 months β’ π Pimpri-Chinchwad
β
β
β
β
β
Piston, Inner, T8, (Non-Ptfe)
βΉ 1,363
View β
Delayed Delivery
Package arrived much later than promised.
π Pharmaceutical & Cosmetics
βοΈ Lotion emulsion blending
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
A
Amit Singh
β Verified
23 Jun 2026 β’ 1β6 months β’ π Kolkata
β
β
β
β
β
Seat, Valve, Neoprene
βΉ 914
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Bleach injection
π Kolkata
Quality 4/5
Delivery 4/5
R
Ridhima Nair
β Verified
23 Jun 2026 β’ Less than 1 month β’ π Kolkata
β
β
β
β
β
CENTER BLOCK, T15, POLY
βΉ 32,903
View β
Poor Quality Control
The item felt cheap and fell short.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Kolkata
Quality 4/5
Delivery 4/5
S
Sandeep Bose
β Verified
23 Jun 2026 β’ Over 1 year β’ π Ahmedabad
β
β
β
β
β
End Cap W/Guide, T8
βΉ 173
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Thinner dosing
π Ahmedabad
Quality 4/5
Delivery 4/5
G
Gaurav Trivedi
β Verified
23 Jun 2026 β’ Over 1 year β’ π Agra
β
β
β
β
β
Manifold, Discharge
βΉ 4,598
View β
Broken Links On Site
Several search features did not load properly.
π Pharmaceutical & Cosmetics
βοΈ Mouthwash batching
π Agra
Quality 4/5
Delivery 4/5
S
Sneha Reddy
β Verified
23 Jun 2026 β’ 6β12 months β’ π Bengaluru
β
β
β
β
β
KIT, POWER CYLINDER SEAL
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Food and Beverage
βοΈ Vinegar bottling
π Bengaluru
Quality 4/5
Delivery 4/5
P
Pranav N
β Verified
23 Jun 2026 β’ Less than 1 month β’ π Tuticorin
β
β
β
β
β
GASKET, CENTER BLOCK, PS4-PS15
βΉ 406
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Tuticorin
Quality 4/5
Delivery 4/5
R
Ranveer Trivedi
β Verified
23 Jun 2026 β’ Over 1 year β’ π Ranchi
β
β
β
β
β
PISTON, OUTER, (NON-PTFE)
βΉ 6,663
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Grout injection
π Ranchi
Quality 4/5
Delivery 4/5