S
Santosh Sharma
β Verified
31 May 2026 β’ Over 1 year β’ π Visakhapatnam
β
β
β
β
β
GASKET, T-SECTION, 2" EHEDG
βΉ 297
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Concrete batch water
π Visakhapatnam
Quality 4/5
Delivery 4/5
R
Raghav Das
β Verified
31 May 2026 β’ 6β12 months β’ π Ludhiana
β
β
β
β
β
PISTON, OUTER, (ULTRA-FLEX)
βΉ 6,187
View β
Confusing Interface
Website was difficult to navigate and use.
π Chemical Processing
βοΈ Resin transfer
π Ludhiana
Quality 4/5
Delivery 4/5
S
Shreya Grover
β Verified
31 May 2026 β’ 1β6 months β’ π Indore
β
β
β
β
β
SHAFT, SOL,COMBO
βΉ 3,766
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Tank circulation
π Indore
Quality 4/5
Delivery 4/5
D
Diya Tiwar
β Verified
31 May 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
Clamp Band, Small
βΉ 2,294
View β
Defective Out of Box
Item failed to work on the first try.
π Pharmaceutical & Cosmetics
βοΈ Aerosol propellant feed
π Delhi
Quality 4/5
Delivery 4/5
R
Raman Rathod
β Verified
31 May 2026 β’ 1β6 months β’ π Bhopal
β
β
β
β
β
GSKT, MUFFLER,ISOLATOR, PX4/15
βΉ 1,164
View β
Broken Links On Site
Several search features did not load properly.
π Chemical Processing
βοΈ Fertilizer blending
π Bhopal
Quality 4/5
Delivery 4/5
P
Pooja Bose
β Verified
31 May 2026 β’ 1β6 months β’ π Bengaluru
β
β
β
β
β
BALL, VALVE, BUNA
βΉ 1,430
View β
Poor Quality Control
The item felt cheap and fell short.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Bengaluru
Quality 4/5
Delivery 4/5
A
Amrit Solanki
β Verified
31 May 2026 β’ Over 1 year β’ π Pune
β
β
β
β
β
Seat Valve, Polyurethane
βΉ 1,087
View β
Damaged Packaging
Box was torn up and items were loose.
π Food and Beverage
βοΈ Gelatin batching
π Pune
Quality 4/5
Delivery 4/5
P
Prem Reddy
β Verified
31 May 2026 β’ 1β6 months β’ π Faridabad
β
β
β
β
β
DIAPHRAGM, PRIMARY, FDA BUNA
βΉ 3,991
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Mining and Construction
βοΈ Conveyor sump cleanout
π Faridabad
Quality 4/5
Delivery 4/5
R
Ritam Kumar
β Verified
31 May 2026 β’ 1β6 months β’ π Pimpri-Chinchwad
β
β
β
β
β
MANIFOLD, INLET, FOOTED-BSPT
βΉ 7,374
View β
Unhelpful Support
Took days to get a generic email reply.
π Mining and Construction
βοΈ Hydraulic oil scavenging
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
S
Sumit Gupta
β Verified
31 May 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
ASSY, AIR VALVE, PV4/15, NP
βΉ 28,340
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Mining and Construction
βοΈ Remote fuel transfer
π Lucknow
Quality 4/5
Delivery 4/5