P
Piyush Choudhary
β Verified
02 May 2026 β’ 1β6 months β’ π Bhopal
β
β
β
β
β
Bolt, Rhsn, 5/16-18 X 2 1/2
βΉ 127
View β
Unhelpful Support
Took days to get a generic email reply.
π Water and Wastewater Treatment
βοΈ Stormwater overflow bypass
π Bhopal
Quality 4/5
Delivery 4/5
S
Shikhar Reddy
β Verified
02 May 2026 β’ Less than 1 month β’ π Bengaluru
β
β
β
β
β
Clamp Band, Large
βΉ 4,232
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Bengaluru
Quality 4/5
Delivery 4/5
C
Chaitanya Trivedi
β Verified
02 May 2026 β’ Over 1 year β’ π Jabalpur
β
β
β
β
β
SEAT, VALVE, 400, SS, DROP IN
βΉ 4,313
View β
Confusing Interface
Website was difficult to navigate and use.
π Mining and Construction
βοΈ Truck wash evacuation
π Jabalpur
Quality 4/5
Delivery 4/5
S
Sushant Naidu
β Verified
02 May 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
Diaphragm, Back-Up, Neoprene
βΉ 1,622
View β
Broken Links On Site
Several search features did not load properly.
π Food and Beverage
βοΈ Pet food injection
π Thane
Quality 4/5
Delivery 4/5
N
Nilesh Das
β Verified
02 May 2026 β’ Less than 1 month β’ π Pune
β
β
β
β
β
STUD, 3/8-16 X 1 1/4-
βΉ 340
View β
Delayed Delivery
Package arrived much later than promised.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Pune
Quality 4/5
Delivery 4/5
D
Deepak Patel
β Verified
02 May 2026 β’ Over 1 year β’ π Lucknow
β
β
β
β
β
Gasket, Muffler Plate
βΉ 59
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Alum dosing
π Lucknow
Quality 4/5
Delivery 4/5
V
Vikram Trivedi
β Verified
02 May 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
Screw, Hhc, 10-24 X 1 1/2
βΉ 25
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Pond silt dredging
π Chennai
Quality 4/5
Delivery 4/5
V
Vivaan Kapoor
β Verified
02 May 2026 β’ Less than 1 month β’ π Lucknow
β
β
β
β
β
O-RING, (1.421 X.139)TF/VT,CHP
βΉ 580
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Pharmaceutical & Cosmetics
βοΈ Chromatography column feeding
π Lucknow
Quality 4/5
Delivery 4/5
R
Ravi Shah
β Verified
02 May 2026 β’ Less than 1 month β’ π Mumbai
β
β
β
β
β
CENTER SECTION, T2,TURBO,POLY
βΉ 18,460
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Paint, Ink, and Coatings
βοΈ Ink press recirculation
π Mumbai
Quality 4/5
Delivery 4/5
V
Vijay Rao
β Verified
02 May 2026 β’ Less than 1 month β’ π Visakhapatnam
β
β
β
β
β
O-Ring, (.987 X.103)Tfe/Vt,Chp
βΉ 520
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Paint, Ink, and Coatings
βοΈ Solvent recovery distillation
π Visakhapatnam
Quality 4/5
Delivery 4/5