J
Jitendra Arora
β Verified
03 May 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
VALVE BALL PTFE (1 50 60 23)
βΉ 12,826
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Water and Wastewater Treatment
βοΈ Slurry polymer mixing
π Mumbai
Quality 4/5
Delivery 4/5
A
Arjun Reddy
β Verified
03 May 2026 β’ 6β12 months β’ π Howrah
β
β
β
β
β
BUMPER 3" (132.035.357)
βΉ 350
View β
Frequent Errors
The online portal lags significantly during processing.
π Food and Beverage
βοΈ Brine injection supply
π Howrah
Quality 4/5
Delivery 4/5
G
Gopal Naidu
β Verified
03 May 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
BACK PLATE ST/STEEL - EXB (06-009)
View β
Frequent Errors
The online portal lags significantly during processing.
π Chemical Processing
βοΈ Solvent extraction
π Indore
Quality 4/5
Delivery 4/5
G
Girish Dutta
β Verified
03 May 2026 β’ 1β6 months β’ π Dhanbad
β
β
β
β
β
DIAPHRAGM VITON - 1" (1A-039)
βΉ 23,008
View β
Damaged Arrival
Packaging arrived crushed and internal contents were compromised.
π Chemical Processing
βοΈ Resin transfer
π Dhanbad
Quality 4/5
Delivery 4/5
I
Ishaan Singh
β Verified
03 May 2026 β’ 1β6 months β’ π Delhi
β
β
β
β
β
SHAFT AISI 304 (1 25 40 50)
βΉ 6,171
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Pharmaceutical & Cosmetics
βοΈ Toothpaste compounding
π Delhi
Quality 4/5
Delivery 4/5
S
Sundarapandian Selvam
β Verified
03 May 2026 β’ 1β6 months β’ π Tuticorin
β
β
β
β
β
END CAP-EXB (165.127.157)
βΉ 965
View β
Disappointing Value
Poor performance makes this a low-value investment.
π Water and Wastewater Treatment
βοΈ Alum dosing
π Tuticorin
Quality 4/5
Delivery 4/5
A
Ananya Agarwal
β Verified
02 May 2026 β’ 1β6 months β’ π Thane
β
β
β
β
β
Manifold, Discharge, Bsp
βΉ 10,679
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Filter press recirculation
π Thane
Quality 4/5
Delivery 4/5
R
Ridhima Malhotra
β Verified
02 May 2026 β’ 6β12 months β’ π Delhi
β
β
β
β
β
Shaft, Str, Non-Ptfe, T20
βΉ 2,373
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Reactor batching
π Delhi
Quality 4/5
Delivery 4/5
G
Gaurav Yadav
β Verified
02 May 2026 β’ Over 1 year β’ π Bhopal
β
β
β
β
β
Diaphragm Primary Bolted
βΉ 12,463
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Methanol dosing
π Bhopal
Quality 4/5
Delivery 4/5
R
Rakesh Chauhan
β Verified
02 May 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
SHAFT, PV810 BRAHMA
βΉ 4,681
View β
Broken Links On Site
Several search features did not load properly.
π Mining and Construction
βοΈ Grout injection
π Thane
Quality 4/5
Delivery 4/5