H
Harish Bajaj
β Verified
03 May 2026 β’ Over 1 year β’ π Bhopal
β
β
β
β
β
AODD PUMP 1 1/2 INCH-SS 316 MOC (B40 05 SA BB TTS 471)
βΉ 135,000
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Chemical Processing
βοΈ Tank circulation
π Bhopal
Quality 4/5
Delivery 4/5
A
Alok Dubey
β Verified
03 May 2026 β’ Less than 1 month β’ π Indore
β
β
β
β
β
WETTED END KIT
βΉ 18,254
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Water and Wastewater Treatment
βοΈ Effluent sampling
π Indore
Quality 4/5
Delivery 4/5
R
Ranveer Naidu
β Verified
03 May 2026 β’ 6β12 months β’ π Vijayawada
β
β
β
β
β
DIAPHRAGM PTFE BACKUP - 2" (1B-054)
βΉ 7,200
View β
Broken Functionality
The search tool returns irrelevant or empty results.
π Chemical Processing
βοΈ Catalyst injection
π Vijayawada
Quality 4/5
Delivery 4/5
P
Pranav Dubey
β Verified
03 May 2026 β’ Less than 1 month β’ π Amritsar
β
β
β
β
β
SUCTION VALVE SEAT - EXB (1H-159)
βΉ 3,864
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Mining and Construction
βοΈ Pond silt dredging
π Amritsar
Quality 4/5
Delivery 4/5
V
Vivaan Sen
β Verified
03 May 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
O-RING INLET/ OUTLET FFKM (2 50 70 04)
βΉ 9,317
View β
Complex Layout
Cluttered layout slows down standard item tracking.
π Chemical Processing
βοΈ Leachate recovery
π Delhi
Quality 4/5
Delivery 4/5
P
Puneet Rathod
β Verified
03 May 2026 β’ 6β12 months β’ π Madurai
β
β
β
β
β
DIAPHRAGM SHAFT BUSH - EXB (25-089)
βΉ 5,510
View β
Frequent Errors
The online portal lags significantly during processing.
π Pharmaceutical & Cosmetics
βοΈ Cosmetic clay masks
π Madurai
Quality 4/5
Delivery 4/5
R
Rahul Mehta
β Verified
03 May 2026 β’ Over 1 year β’ π Patna
β
β
β
β
β
DIAPHRAGM TEFLON - 1.5" (40-020)
βΉ 15,846
View β
Improper Handling
Rough handling during transit caused noticeable visual scuffs.
π Paint, Ink, and Coatings
βοΈ Pigment mill feeding
π Patna
Quality 4/5
Delivery 4/5
T
Tanvi Mishra
β Verified
03 May 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
VALVE SEAT (50-276)
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Paint, Ink, and Coatings
βοΈ Dye metering
π Bhopal
Quality 4/5
Delivery 4/5
V
Vivaan Grover
β Verified
03 May 2026 β’ Less than 1 month β’ π Surat
β
β
β
β
β
AIR SIDE KIT HT - 1"
βΉ 6,783
View β
Unhelpful Response
The technical team failed to address our direct issue.
π Water and Wastewater Treatment
βοΈ Sump dewatering
π Surat
Quality 4/5
Delivery 4/5
N
Naman Reddy
β Verified
03 May 2026 β’ 1β6 months β’ π Aurangabad
β
β
β
β
β
GASKET CENTER SECTION (06-170)
View β
Missing Details
Critical item specifications are omitted from the page.
π Paint, Ink, and Coatings
βοΈ Spray booth extraction
π Aurangabad
Quality 3/5
Delivery 3/5