R
Rohan Jadav
β Verified
04 May 2026 β’ 1β6 months β’ π Ludhiana
β
β
β
β
β
DIAPHRAGM TEFLON (1 50 50 05)
βΉ 71,153
View β
Poor Communication
Felt dismissed when trying to resolve configuration gaps.
π Paint, Ink, and Coatings
βοΈ Glue packaging
π Ludhiana
Quality 4/5
Delivery 4/5
G
Govind Chatterjee
β Verified
04 May 2026 β’ 1β6 months β’ π Patna
β
β
β
β
β
VALVE BALL PTFE - 1/4" (06-145)
βΉ 902
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Chemical Processing
βοΈ Tanker offloading
π Patna
Quality 3/5
Delivery 3/5
K
Kabir Deshmukh
β Verified
04 May 2026 β’ 1β6 months β’ π Raipur
β
β
β
β
β
VALVE PLATE (06-003)
View β
Lack of Expertise
Representatives lacked depth on standard platform parameters.
π Food and Beverage
βοΈ Gelatin batching
π Raipur
Quality 4/5
Delivery 4/5
S
Shantanu Joshi
β Verified
04 May 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
VALVE CAP - LEFT HAND -1" - EXB (1A-030)
βΉ 969
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Water and Wastewater Treatment
βοΈ Grit chamber evacuation
π Vadodara
Quality 4/5
Delivery 4/5
V
Velmurugan Pandian
β Verified
04 May 2026 β’ 6β12 months β’ π Hosur
β
β
β
β
β
DIAPHRAGM SANTOPRENE BACKUP - EXB (15-219)
βΉ 4,275
View β
Hardware Glitch
Stopped responding during initial operational tests.
π Paint, Ink, and Coatings
βοΈ Primer coat feeding
π Hosur
Quality 4/5
Delivery 4/5
A
Aniket Grover
β Verified
04 May 2026 β’ 6β12 months β’ π Kota
β
β
β
β
β
KIT, ROTOR & SUPPORT 1" (125500-3)
βΉ 15,574
View β
Confusing Setup
Poor interface design makes filtering items difficult.
π Oil and Gas
βοΈ Aviation Fueling Skids
π Kota
Quality 4/5
Delivery 4/5
D
Dev Naidu
β Verified
04 May 2026 β’ 6β12 months β’ π Thane
β
β
β
β
β
CENTER HOUSING SEAL (1 15 85 22)
βΉ 726
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Chemical Processing
βοΈ Tank circulation
π Thane
Quality 4/5
Delivery 4/5
K
Kavya Chatterjee
β Verified
03 May 2026 β’ 1β6 months β’ π Ahmedabad
β
β
β
β
β
TURB METER SS 1" (G2S10FQ9GMD)
βΉ 98,262
View β
Slow Loading
Product pages forever.
π Food and Beverage
βοΈ Baking Yeast Water Prep
π Ahmedabad
Quality 4/5
Delivery 4/5
P
Priya Deshmukh
β Verified
03 May 2026 β’ 6β12 months β’ π Chennai
β
β
β
β
β
O-RING - EXB
View β
Unresponsive Support
Left on hold without receiving any clear resolution.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Chennai
Quality 4/5
Delivery 4/5
A
Anjali Patel
β Verified
03 May 2026 β’ Less than 1 month β’ π Jaipur
β
β
β
β
β
SUBMERSIBLE SEWAGE PUMP WITH 3 HP MOTOR & 3 HP DOL DIGITAL STARTER (CFSW 333)
βΉ 44,471
View β
Delayed Delivery
The shipment arrived well past the promised timeline.
π Chemical Processing
βοΈ Reactor batching
π Jaipur
Quality 4/5
Delivery 4/5