M
Manoj Verma
β Verified
01 Mar 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
MUFFLER PLATE, PV4, NICKEL PLT
βΉ 3,584
View β
Broken Links On Site
Several search features did not load properly.
π Paint, Ink, and Coatings
βοΈ Filling machine supply
π Indore
Quality 4/5
Delivery 4/5
V
Vikas Arora
β Verified
01 Mar 2026 β’ Over 1 year β’ π Kota
β
β
β
β
β
O-RING(3.350 X .210) ENC/VT
βΉ 1,178
View β
Delayed Delivery
Package arrived much later than promised.
π Pharmaceutical & Cosmetics
βοΈ Essential oil extraction
π Kota
Quality 4/5
Delivery 4/5
P
Puneet Shinde
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
CAP 1/4-20, SHCS 3A ADS
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Mining and Construction
βοΈ Conveyor sump cleanout
π Vadodara
Quality 4/5
Delivery 4/5
V
Vivaan Agarwal
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Dhanbad
β
β
β
β
β
BALL, VALVE, SANIFLEX
βΉ 793
View β
Damaged Packaging
Box was torn up and items were loose.
π Food and Beverage
βοΈ Pet food injection
π Dhanbad
Quality 4/5
Delivery 4/5
R
Rahul Deshmukh
β Verified
01 Mar 2026 β’ 6β12 months β’ π Delhi
β
β
β
β
β
END CAP W/GUIDE, T1
βΉ 135
View β
Broken Links On Site
Several search features did not load properly.
π Paint, Ink, and Coatings
βοΈ Filter press recirculation
π Delhi
Quality 4/5
Delivery 4/5
S
Sneha Yadav
β Verified
01 Mar 2026 β’ 6β12 months β’ π Thane
β
β
β
β
β
Ball, Valve, Buna, Adv
βΉ 429
View β
Defective Out of Box
Item failed to work on the first try.
π Pharmaceutical & Cosmetics
βοΈ Cough syrup filling
π Thane
Quality 4/5
Delivery 4/5
S
Suresh Yadav
β Verified
01 Mar 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
MANIFOLD, DISCHARGE, ANSI
βΉ 17,781
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Hot melt pre-heating
π Mumbai
Quality 4/5
Delivery 4/5
V
Varun Pillai
β Verified
01 Mar 2026 β’ 6β12 months β’ π Patna
β
β
β
β
β
Chamber, Liquid
βΉ 733
View β
Confusing Interface
Website was difficult to navigate and use.
π Mining and Construction
βοΈ Underground utility clearing
π Patna
Quality 4/5
Delivery 4/5
P
Pooja Agarwal
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Bhopal
β
β
β
β
β
CLAMP BAND, SMALL, NESTED
βΉ 1,401
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Mining and Construction
βοΈ Filter cake washing
π Bhopal
Quality 4/5
Delivery 4/5
D
Diya Chatterjee
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Chennai
β
β
β
β
β
BUSHING ASSEMBLY, SHAFT, H200
View β
Unhelpful Support
Took days to get a generic email reply.
π Food and Beverage
βοΈ Cooking oil filtration
π Chennai
Quality 4/5
Delivery 4/5