N
Nikhil Khanna
β Verified
01 Mar 2026 β’ 6β12 months β’ π Lucknow
β
β
β
β
β
O-RING (0.990X0.177), POLY, M2R
βΉ 254
View β
Poor Quality Control
The item felt cheap and fell short.
π Chemical Processing
βοΈ Drum emptying
π Lucknow
Quality 4/5
Delivery 4/5
V
Vihaan Shah
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
Diaphragm Primary Saniflex
βΉ 630
View β
Delayed Delivery
Package arrived much later than promised.
π Water and Wastewater Treatment
βοΈ Coagulant feeding
π Nagpur
Quality 4/5
Delivery 4/5
A
Aarav Mishra
β Verified
01 Mar 2026 β’ Less than 1 month β’ π Patna
β
β
β
β
β
Diaphragm Primary Buna
βΉ 1,185
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Water and Wastewater Treatment
βοΈ Coagulant feeding
π Patna
Quality 4/5
Delivery 4/5
A
Amit Reddy
β Verified
01 Mar 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
Pro-Flo Air Valve End Cap
βΉ 355
View β
Damaged Packaging
Box was torn up and items were loose.
π Mining and Construction
βοΈ Explosive slurry loading
π Pune
Quality 4/5
Delivery 4/5
S
Sneha Das
β Verified
28 Feb 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
DIAPHRAGM SHAFT SEAL -EXB (G536)
View β
Beware! Poor Value
Low quality overpriced.
π Chemical Processing
βοΈ Neutralization feeding
π Mumbai
Quality 4/5
Delivery 4/5
K
Kavya Chatterjee
β Verified
28 Feb 2026 β’ Less than 1 month β’ π Pune
β
β
β
β
β
Omron MY2 DPDT General Purpose Relay, 14-pin (MY4N-GS-R AC24)
βΉ 456
View β
Confusing Compatibility Matrix
The website chart listed the sensor as compatible with our model, but the terminal pinouts are completely different.
π Power Generation & Electrical Utilities
βοΈ Transmission Lines
π Pune
Quality 4/5
Delivery 4/5
H
Harish Joshi
β Verified
27 Feb 2026 β’ 1β6 months β’ π Chennai
β
β
β
β
β
O' RING-EXB (G059)
View β
Poor Construction
Materials feel fragile and build quality is subpar.
π Paint, Ink, and Coatings
βοΈ Spray booth extraction
π Chennai
Quality 4/5
Delivery 4/5
K
Kriti Mehta
β Verified
27 Feb 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
O-RING
View β
Unexpected Charges
Additional hidden fees were tacked onto the final bill.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Delhi
Quality 4/5
Delivery 4/5
A
Aakash Khanna
β Verified
27 Feb 2026 β’ 1β6 months β’ π Kanpur
β
β
β
β
β
AIR INLET CAP ASSY CW ORIFICE (B165.116.157 E)
βΉ 2,945
View β
Incomplete Package
Several vital components were missing from the order box.
π Pharmaceutical & Cosmetics
βοΈ Aerosol propellant feed
π Kanpur
Quality 4/5
Delivery 4/5
D
Deepak Gupta
β Verified
27 Feb 2026 β’ 1β6 months β’ π Pimpri-Chinchwad
β
β
β
β
β
RETAINING RING (B675.044.115)
βΉ 790
View β
Incomplete Package
Several vital components were missing from the order box.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5