S
Sai Garg
β Verified
04 Jan 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
PISTON, OUTER, (NON-PTFE)
βΉ 39,828
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Drum tinting supply
π Mumbai
Quality 4/5
Delivery 4/5
S
Sai Deshmukh
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Patna
β
β
β
β
β
Clamp Band, Large
βΉ 9,164
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Mining and Construction
βοΈ Acid mine drainage
π Patna
Quality 4/5
Delivery 4/5
R
Ram Shah
β Verified
04 Jan 2026 β’ 1β6 months β’ π Jaipur
β
β
β
β
β
AIR VALVE, 04-15,PRO-FLOX
βΉ 15,503
View β
Delayed Delivery
Package arrived much later than promised.
π Water and Wastewater Treatment
βοΈ Lime slurry transfer
π Jaipur
Quality 4/5
Delivery 4/5
S
Sai Srivastava
β Verified
04 Jan 2026 β’ 1β6 months β’ π Nagpur
β
β
β
β
β
Seat, Valve, Neoprene
βΉ 914
View β
Poor Quality Control
The item felt cheap and fell short.
π Food and Beverage
βοΈ Flavoring oil dosing
π Nagpur
Quality 4/5
Delivery 4/5
K
Kabir Singh
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Vadodara
β
β
β
β
β
CHAMBER, LIQUID, ADV
βΉ 11,840
View β
Confusing Interface
Website was difficult to navigate and use.
π Paint, Ink, and Coatings
βοΈ Can coating circulation
π Vadodara
Quality 4/5
Delivery 4/5
R
Ridhima Dubey
β Verified
04 Jan 2026 β’ 1β6 months β’ π Vadodara
β
β
β
β
β
Center Block, T15, Alum
βΉ 28,270
View β
Unhelpful Support
Took days to get a generic email reply.
π Pharmaceutical & Cosmetics
βοΈ Tablet coating supply
π Vadodara
Quality 4/5
Delivery 4/5
K
Kunal Sen
β Verified
04 Jan 2026 β’ 6β12 months β’ π Mumbai
β
β
β
β
β
STUD, 5/8-18 X 2-
βΉ 957
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Mining and Construction
βοΈ Cement grind aid
π Mumbai
Quality 4/5
Delivery 4/5
S
Shantanu Kulkarni
β Verified
04 Jan 2026 β’ 1β6 months β’ π Mumbai
β
β
β
β
β
CHAMBER, AIR, PV800
βΉ 17,405
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Mumbai
Quality 4/5
Delivery 4/5
A
Amit Srivastava
β Verified
04 Jan 2026 β’ Over 1 year β’ π Delhi
β
β
β
β
β
PIPE, 3/8 SCHED 40 X 2.375
View β
Defective Out of Box
Item failed to work on the first try.
π Water and Wastewater Treatment
βοΈ Polymer dosing
π Delhi
Quality 4/5
Delivery 4/5
R
Ritesh Shukla
β Verified
04 Jan 2026 β’ 1β6 months β’ π Uttar Pradesh
β
β
β
β
β
T-SECTION, BOLTED, (DIN)
βΉ 3,525
View β
Unhelpful Support
Took days to get a generic email reply.
π Water and Wastewater Treatment
βοΈ Membrane CIP feeding
π Uttar Pradesh
Quality 4/5
Delivery 4/5