A
Arun Joshi
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Delhi
β
β
β
β
β
SEAT, VALVE, H200
βΉ 1,562
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Tank circulation
π Delhi
Quality 4/5
Delivery 4/5
R
Riya Goel
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Thane
β
β
β
β
β
ASSY, PILOT SLEEVE, P2
βΉ 5,024
View β
Damaged Packaging
Box was torn up and items were loose.
π Paint, Ink, and Coatings
βοΈ Varnish transfer
π Thane
Quality 4/5
Delivery 4/5
D
Deepak Jadav
β Verified
04 Jan 2026 β’ 1β6 months β’ π Pimpri-Chinchwad
β
β
β
β
β
END CAP W/O GUIDE, T2, REVISED
βΉ 75
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Chemical Processing
βοΈ Reactor batching
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
N
Neha Goel
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Mumbai
β
β
β
β
β
Elbow, Discharge Manifold
βΉ 685
View β
Poor Quality Control
The item felt cheap and fell short.
π Paint, Ink, and Coatings
βοΈ Dye metering
π Mumbai
Quality 4/5
Delivery 4/5
D
Diya Jadav
β Verified
04 Jan 2026 β’ 1β6 months β’ π Nagpur
β
β
β
β
β
Diaphragm Primary Wilflex
βΉ 556
View β
Unhelpful Support
Took days to get a generic email reply.
π Water and Wastewater Treatment
βοΈ Sump dewatering
π Nagpur
Quality 4/5
Delivery 4/5
I
Ishita Gupta
β Verified
04 Jan 2026 β’ 1β6 months β’ π Visakhapatnam
β
β
β
β
β
VALVE SEAT
βΉ 490
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Paint, Ink, and Coatings
βοΈ Pigment mill feeding
π Visakhapatnam
Quality 4/5
Delivery 4/5
S
Sunil Chatterjee
β Verified
04 Jan 2026 β’ Less than 1 month β’ π Hyderabad
β
β
β
β
β
Chamber, Liquid
βΉ 703
View β
Confusing Interface
Website was difficult to navigate and use.
π Pharmaceutical & Cosmetics
βοΈ Cosmetic clay masks
π Hyderabad
Quality 4/5
Delivery 4/5
S
Suresh Deshmukh
β Verified
04 Jan 2026 β’ 6β12 months β’ π Bhopal
β
β
β
β
β
AIR SIDE KIT
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Pond silt dredging
π Bhopal
Quality 4/5
Delivery 4/5
A
Aarav Bose
β Verified
04 Jan 2026 β’ Over 1 year β’ π Bengaluru
β
β
β
β
β
O-Ring (.549 X .103) Tfe.Viton
βΉ 516
View β
Broken Links On Site
Several search features did not load properly.
π Chemical Processing
βοΈ Leachate recovery
π Bengaluru
Quality 4/5
Delivery 4/5
M
Mitchell A.
β Verified
23 Sep 2026 β’ 1β6 months
β
β
β
β
β
AIR FILTER REGULATOR WITH PRESSURE GAUGE - AFT PORT SIZE 3/4"
βΉ 2,063
View β
good product
π Chemical Processing
βοΈ Acid transfer pump
Quality 5/5
Delivery 5/5