G
Gopal Naidu
β Verified
22 Feb 2026 β’ 6β12 months β’ π Vadodara
β
β
β
β
β
Manifold, Inlet, footed
βΉ 23,543
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Concrete batch water
π Vadodara
Quality 4/5
Delivery 4/5
T
Tushar Jadav
β Verified
22 Feb 2026 β’ 1β6 months β’ π Ranchi
β
β
β
β
β
SEAT, VALVE, BUNA
βΉ 552
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Paint, Ink, and Coatings
βοΈ Thinner dosing
π Ranchi
Quality 4/5
Delivery 4/5
S
Sourabh Shah
β Verified
22 Feb 2026 β’ Less than 1 month β’ π Patna
β
β
β
β
β
ASSY, AIR VALVE, PS 4-15, NP
βΉ 34,300
View β
Broken Links On Site
Several search features did not load properly.
π Pharmaceutical & Cosmetics
βοΈ Vaccine adjuvant addition
π Patna
Quality 4/5
Delivery 4/5
K
Karan Joshi
β Verified
22 Feb 2026 β’ 1β6 months β’ π Aurangabad
β
β
β
β
β
NUT,HEX FLANGE 3/8
βΉ 50
View β
Poor Quality Control
The item felt cheap and fell short.
π Mining and Construction
βοΈ Drilling mud recirculation
π Aurangabad
Quality 4/5
Delivery 4/5
N
Nitin Grover
β Verified
22 Feb 2026 β’ 1β6 months β’ π Lucknow
β
β
β
β
β
DIAPHRAGM, PRIMARY, H800 FFLOW
βΉ 8,425
View β
Unhelpful Support
Took days to get a generic email reply.
π Food and Beverage
βοΈ Beer bottling feed
π Lucknow
Quality 4/5
Delivery 4/5
M
Mohan Mehta
β Verified
22 Feb 2026 β’ Over 1 year β’ π Vadodara
β
β
β
β
β
SEAT, VALVE, VITON
βΉ 1,556
View β
Delayed Delivery
Package arrived much later than promised.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Vadodara
Quality 4/5
Delivery 4/5
K
Karunakaran Moorthy
β Verified
22 Feb 2026 β’ 1β6 months β’ π Hosur
β
β
β
β
β
Diaphragm Primary PTFE
βΉ 5,899
View β
Damaged Packaging
Box was torn up and items were loose.
π Water and Wastewater Treatment
βοΈ Carbon slurry pumping
π Hosur
Quality 4/5
Delivery 4/5
R
Rahul Nair
β Verified
22 Feb 2026 β’ 6β12 months β’ π Kolkata
β
β
β
β
β
SEAT,VALVE,PVDF,M2R
βΉ 557
View β
Poor Quality Control
The item felt cheap and fell short.
π Chemical Processing
βοΈ Leachate recovery
π Kolkata
Quality 4/5
Delivery 4/5
S
Sneha Kumar
β Verified
22 Feb 2026 β’ 1β6 months β’ π Kolkata
β
β
β
β
β
Piston, Inner, P2 (Non-Ptfe)
βΉ 1,085
View β
Hidden Extra Fees
Charged unexpected costs at final checkout.
π Chemical Processing
βοΈ Acid pickling
π Kolkata
Quality 4/5
Delivery 4/5
A
Ananya Pillai
β Verified
22 Feb 2026 β’ Over 1 year β’ π Hyderabad
β
β
β
β
β
Gasket, Air Valve - MOC: Rubber
βΉ 72
View β
Confusing Interface
Website was difficult to navigate and use.
π Mining and Construction
βοΈ Explosive emulsion transfer
π Hyderabad
Quality 4/5
Delivery 4/5