A
Ananya Grover
β Verified
22 Feb 2026 β’ Less than 1 month β’ π Nagpur
β
β
β
β
β
Diaphragm Primary Neoprene
βΉ 1,202
View β
Defective Out of Box
Item failed to work on the first try.
π Mining and Construction
βοΈ Conveyor sump cleanout
π Nagpur
Quality 4/5
Delivery 4/5
K
Kavya Rao
β Verified
22 Feb 2026 β’ Over 1 year β’ π Vadodara
β
β
β
β
β
O-RING (2.359 X .139), NORDEL
βΉ 43
View β
Unhelpful Support
Took days to get a generic email reply.
π Mining and Construction
βοΈ Explosive emulsion transfer
π Vadodara
Quality 4/5
Delivery 4/5
A
Aditya Malhotra
β Verified
22 Feb 2026 β’ Over 1 year β’ π Indore
β
β
β
β
β
Ball, Valve, Teflon - Parts of Air operated Double d
βΉ 231
View β
Broken Links On Site
Several search features did not load properly.
π Water and Wastewater Treatment
βοΈ Leachate extraction
π Indore
Quality 4/5
Delivery 4/5
P
Pranav Chatterjee
β Verified
22 Feb 2026 β’ Less than 1 month β’ π Kota
β
β
β
β
β
MANIFOLD, INLET, P200, NPT
βΉ 5,281
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Pharmaceutical & Cosmetics
βοΈ Nail polish filling
π Kota
Quality 4/5
Delivery 4/5
D
Diya Mehta
β Verified
22 Feb 2026 β’ 1β6 months β’ π Pimpri-Chinchwad
β
β
β
β
β
T-Section, (Npt)
βΉ 1,259
View β
Subpar Materials
Broke easily under normal daily usage conditions.
π Pharmaceutical & Cosmetics
βοΈ Hair dye compounding
π Pimpri-Chinchwad
Quality 4/5
Delivery 4/5
G
Gaurav Srivastava
β Verified
22 Feb 2026 β’ 1β6 months β’ π Pune
β
β
β
β
β
ELEMENT MUFFLER (UHMW PE)
βΉ 375
View β
Delayed Delivery
Package arrived much later than promised.
π Mining and Construction
βοΈ Mine shaft dewatering
π Pune
Quality 4/5
Delivery 4/5
A
Aakash Agarwal
β Verified
22 Feb 2026 β’ 6β12 months β’ π Visakhapatnam
β
β
β
β
β
AIR SIDE KIT
βΉ 2,485
View β
Way Too Expensive
Not worth the premium cost over alternatives.
π Water and Wastewater Treatment
βοΈ Clarifier bottom drainage
π Visakhapatnam
Quality 4/5
Delivery 4/5
D
Deepak Bose
β Verified
22 Feb 2026 β’ Less than 1 month β’ π Bengaluru
β
β
β
β
β
SEAT, VALVE, ALUMINUM
βΉ 1,917
View β
Damaged Packaging
Box was torn up and items were loose.
π Food and Beverage
βοΈ Baby food purees
π Bengaluru
Quality 4/5
Delivery 4/5
A
Aarav Deshmukh
β Verified
17 Feb 2026 β’ 6β12 months β’ π Surat
β
β
β
β
β
BALL VALVE FLANGED 2" (GM400-CF8M (50))
View β
NEW. Defective Performance
Item failed entirely.
π Food and Beverage
βοΈ Controlling bulk flow of edible oils from storage tanks
π Surat
Quality 4/5
Delivery 4/5
K
Kavya Banerjee
β Verified
17 Feb 2026 β’ Less than 1 month β’ π Kolkata
β
β
β
β
β
P22 EPDM PHE Gasket
βΉ 640
View β
Beware! Delayed Delivery
Two weeks without.
π Marine & Shipyard
βοΈ Geothermal Scale-Resistant Gaskets
π Kolkata
Quality 4/5
Delivery 4/5